Skip to content

Remade

Remade #28

Triggered via push January 6, 2026 19:10
Status Failure
Total duration 38s
Artifacts

ci.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
test (20.x)
Process completed with exit code 2.
test (20.x): vitest.config.ts#L6
No overload matches this call.
test (18.x)
The strategy configuration was canceled because "test._20_x" failed
test (18.x)
The operation was canceled.
test (18.x): vitest.config.ts#L6
No overload matches this call.