You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Version: 3.0
Last Updated: April 2026
Roadmap Period: April 2026 to April 2027
Vision
Make blockchain as easy as "Sign in with Google" while preserving self-custody and privacy through zero-knowledge proofs. Replace the current single-operator salt service with a 3-of-5 threshold MPC across independent operators, then ship audited contracts to Stellar mainnet with named launch partners and on-chain protocol revenue.
Stellar Dev Digest contributions on Protocol 25 patterns
Planned
Key Performance Indicators (Defensible Floors)
The targets below are deliberately conservative. We commit to floors we can defend on the day of the report. Stretch targets and aspirations are not promised.
User Metrics
Metric
90 days post-mainnet
6 months post-mainnet
12 months post-mainnet
Unique mainnet wallets (cumulative)
500
1,500
5,000
Cumulative ZK proofs verified
5,000
25,000
100,000
30-day retention
25%
30%
35%
Developer Metrics
Metric
Q3 2026
Q4 2026
Q1 2027
SDK monthly downloads
100
250
500
Named dApp integrations live on mainnet
3
5
10
Documentation portal monthly uniques
500
1,000
2,500
Technical Metrics
Metric
Target
Salt-cluster uptime (rolling 30-day)
99.5%
Prover p95 proof generation time
Under 5 seconds
Prover p99 proof generation time
Under 10 seconds
Mainnet transaction success rate
99%
Business Metrics (Post-Mainnet)
Stream
Mechanism
First-year target
Per-proof gateway fee
0.005 XLM per verified eligibility proof, captured on-chain
$1.2K to $6K
Managed prover-as-a-service
Free under 10K proofs/month/dApp; $0.0005 per proof above
$5K to $25K
Enterprise self-hosted tier
$25K/year per company
1 to 3 contracts
Conservative twelve-month projection (post-mainnet): roughly $25K ARR. Base case: roughly $100K ARR. Break-even on operating costs falls between these.
Risk Register
Technical
Risk
Probability
Impact
Mitigation
Audit findings require circuit redesign
Low
High
T3 deliverables gated on T2 close; mainnet does not deploy unaudited code
FROST implementation correctness bug
Low
Critical
Use vetted libraries (zcash/frost or ZF FROST), audit covers protocol
Operator coordination failure during DKG
Medium
Medium
Stipends fund 6 months testnet ops; rehearsal ceremonies before mainnet
Operational
Risk
Probability
Impact
Mitigation
LOI partner slips schedule
Medium
Medium
Floor of 3 partners drops to 2 with documented reason
Operator drops permanently
Medium
Low
Cluster degrades to 3-of-4 (still threshold-secure); replacement onboarded
Grant funding gap before revenue
Medium
High
Conservative ARR projection covers operating costs; per-proof fee active from day one
Market
Risk
Probability
Impact
Mitigation
Passkey wallets capture consumer auth segment
Medium
Medium
Differentiation via eligibility-proof framework (no competitor on Stellar)
Cryptography decisions: Yatharth + audit firm + community review where applicable.
Partner decisions: Atharv + Adwait, with criteria-based vetting.
Financial decisions: Adwait, gated by tranche-disbursement schedule.
Review Cadence
Review
Frequency
Participants
Sprint review
Weekly
Core team
Tranche progress review
Biweekly during active tranches
Core team + advisors
KPI review
Monthly post-mainnet
Core team + community
Changelog
Version
Date
Changes
3.0
April 2026
Restructured for SCF #43 resubmission. Added Distributed Salt MPC as the headline Q3 deliverable. Replaced aspirational targets with defensible floors. Added Honest Open Risks section. Aligned tranche schedule with submission.
This roadmap reflects the state at the start of the SCF #43 round. It will be updated again at award notification, again at each tranche close, and again at mainnet launch.