Overview
Set up PostgreSQL database infrastructure based on the entity design and architecture requirements.
Tasks
Acceptance Criteria
- PostgreSQL operational with complete schema
- Database migrations working correctly
- Development seeds populate test data
- Connection pooling configured for performance
Related Documentation
Phase
Phase 1: Foundation Setup
Priority
High - Core Infrastructure
Overview
Set up PostgreSQL database infrastructure based on the entity design and architecture requirements.
Tasks
Acceptance Criteria
Related Documentation
Phase
Phase 1: Foundation Setup
Priority
High - Core Infrastructure