Repository navigation
VDR/VER migration progress reporting Q&A/feedback/etc. #196
Replies: 3 comments 3 replies
|
We noticed that VDR-TFR-MVF is included as required on the mini-SDR schema but the requirement seems only applicable to Rev5 CSPs not 20x CSPs.
Should 20x CSPs include VDR-TFR-MVF as Not Applicable in their mini-SDR or leave it out? Thanks, |
|
Quick sanity check on the Rev5 timing, since the pieces are spread across NTC-0017 and several pages of the migration site. Here’s our reading: The VDR/VER rules apply December 7, 2026. A Rev5 offering that hasn’t fully migrated owes a per-rule CAP, but nothing gets sent to FedRAMP on December 7 itself. Between December 1 and 10 (current target December 3), FedRAMP sends the Security Inbox Emergency Test to each certified offering, with its FedRAMP ID and unique code. That message sets the deadline, anticipated as December 17 at 2pm Eastern. The response goes through the web form and includes the Progress Report Mini-SDR (CSV or JSON). The CAPs are the per-rule CAP fields inside it, with no separate CAP document. There’s no way to file a Progress Report or CAP before the Emergency Test arrives. Providers should prepare and test early, but filing happens through the test. A VDR/VER CAP sent to FedRAMP some other way before then still has to go in through the Emergency Test. Is that right? One piece of feedback: the deadlines table on the site’s front page lists December 7 but not December 17, which is where we got tangled. A row for the Emergency Test there would help. |
|
Could you clarify how MUST/MUST NOT vs. SHOULD/SHOULD NOT rules—and partial implementations—will be evaluated in the December Progress Report (Mini-SDR) and during February CAP adjudication? Right now, the migration guidance has a couple of nuances we want to be sure we interpret correctly:
|
Uh oh!
There was an error while loading. Please reload this page.
Uh oh!
There was an error while loading. Please reload this page.
VDR/VER Migration Reporting Q&A / General Discussion
On Tue Nov 10, 2026, FedRAMP released Public Notice NTC-0017 VDR/VER Migration Progress Reporting and Upcoming FY27 Q1 FedRAMP Security Inbox Test.
This Notice explained that FedRAMP will be collecting Progress Reports from all FedRAMP Certified cloud service providers who are expected to migrate to the VDR/VER rules and explained how that information will be collected.
It included the VDR/VER Migration Resources website for additional information on Progress Report collection, including deadlines, corrective action plans, schemas, and more.
Collecting progress reports from nearly 600 cloud services is obviously a massive undertaking. We weren't even sure if it was feasible, to be honest. This is partially a test to see how it goes. In the future when folks have adopted CR26 or future consolidated rules things will be much easier as we can simply programmatically monitor everyone's information but today we still need to ask for progress reports.
This thread is dedicated to questions or feedback about this process, including the content, instructions, schemas, etc.
All reactions