GATE CHECKPOINT: Phase 7 - Board Assembly #341

@Franzabner

Description

@Franzabner

Phase 7 Gate Checkpoint

Weeks 7-8

  • All 4 metering ICs respond on SPI
  • All 4 channels calibrated within 2% of reference meter
  • Cross-channel agreement within 1%
  • UART stream received by Orchestrator with zero data loss
  • Live dashboard shows real-time watts per node
  • 1-hour continuous recording produces gap-free trace
  • Calibration certificate committed to epi-meter repo