We need to validate the method and documented a plan upgrading the Diamond on each chain.
[ ] Method is either RPC or Defender
[ ] Role should be UPGRADER_ROLE for RPC but this depends on the results of (#204)
[ ] Each of these needs to be tested locally
Once this is complete each chain should have it's own ticket for an upgrade with the upgrade plan documentation referenced..
We need to validate the method and documented a plan upgrading the Diamond on each chain.
[ ] Method is either RPC or Defender
[ ] Role should be UPGRADER_ROLE for RPC but this depends on the results of (#204)
[ ] Each of these needs to be tested locally
Once this is complete each chain should have it's own ticket for an upgrade with the upgrade plan documentation referenced..