I have had a simulating some climate scenarios using the interative atlas tool. I have found a detail thet showed me atenttion: to CMIP5 experiment (DATASET) is exibitted same periods than CMIP6 experiment (QUANTITY & SCENARIO). However, loocking at AR5 (CMIP5) and AR6 (CMIP6), is possible check using of diferent periods for each Assessment Report. Is this a tool mistake? Thanks a lot.
I have had a simulating some climate scenarios using the interative atlas tool. I have found a detail thet showed me atenttion: to CMIP5 experiment (DATASET) is exibitted same periods than CMIP6 experiment (QUANTITY & SCENARIO). However, loocking at AR5 (CMIP5) and AR6 (CMIP6), is possible check using of diferent periods for each Assessment Report. Is this a tool mistake? Thanks a lot.