Parent
Spec: Syrax v1
What to build
The whole, demoed: the public setup and configuration documents updated to the real contract, then
walked from a clean state directory to a working system where every chat answers. This is the
spec's acceptance pass — the ticket that proves the pieces are one system rather than twelve.
Acceptance criteria
Blocked by
Assisted-by: Claude Fable 5
Co-authored-by: Claude Fable 5 noreply@anthropic.com
Parent
Spec: Syrax v1
What to build
The whole, demoed: the public setup and configuration documents updated to the real contract, then
walked from a clean state directory to a working system where every chat answers. This is the
spec's acceptance pass — the ticket that proves the pieces are one system rather than twelve.
Acceptance criteria
Blocked by
Assisted-by: Claude Fable 5
Co-authored-by: Claude Fable 5 noreply@anthropic.com