diff --git a/docs/governance/workstreams.md b/docs/governance/workstreams.md index 4c349c4..060c29b 100644 --- a/docs/governance/workstreams.md +++ b/docs/governance/workstreams.md @@ -313,6 +313,7 @@ state to its index: [`docs/adr/`](../adr/README.md), [`docs/pdr/`](../pdr/README | D294 | **The template's text left in a description is named** (#543): a pull request kept sections at the template's own text ("What it changes", the Summary's ``) and pr-check said nothing; the row copied as an example came from the handbook's table, while the template's own row was already a placeholder T2 refuses | Done: pr-check warns `[template]`, once, naming each paragraph of the description outside the test sheet that is wholly one `<...>` placeholder (HTML tags, comments and attributes are not one); the warning is not a failure and only runs when the description is carried. The handbook's example table now says it is an example from a sign-in module and that a sheet's scenarios come from its own deliverable's acceptance criteria. Tests: a kept placeholder and title heading are named, a filled description is silent, HTML lines stay silent, a placeholder inside the sheet is T2's and not named | | D295 | **T4 lets an automated row stand at a commit nobody attested** (#548): with `checks: attested`, a pull request verified at X merged the default branch where only another module changed, and T4 refused the automated rows because the relief asked a passing record of X, which projects rarely make (they attest after verifying) — stricter than a row at the head, which needs none | Done: `attest.inputs` takes the commit to read (default `HEAD`); where X has no record at all (a voided one, or one whose `Module checks` failed, is refused as before), `same_inputs` computes the digest from git at X and at the head (same placeholder identity, same base, the scope read from the working tree's manifests — on the forge the test merge, which can only widen it) and the row stands when they are equal, X is in the head's history, and its run, dated by X's commit, is as fresh as a record's; the head's digest is computed once per run, before the head's record is required. When they differ the message is the record path's, with what changed. The git-only digest drops the engine and the runner, which nothing records for an unrecorded commit — as for a row at the head. A record of X is still read first, with its freshness; `checks: forge` unchanged. The handbook's sentence says so. ADR-0006 states no record requirement for the row's commit beyond decision 3's digest, so it is untouched. Tests: no record across a merge of another module stands; a merge that changed `contracts/` or the lockfile is refused naming it; a voided X, a failed X, a stale X, a side-branch X and an X missing a module folder are refused; the head's digest is read once; the keep by record is unchanged | | D296 | **A root README change costs every open pull request its end-to-end runs** (#550, a consumer project, 2026-11-26: a row verified at a commit with a passing record was refused because the merged default branch changed only another module and the root `README.md`; about an hour of end-to-end runs for a line of prose). ADR-0006 decision 2 kept every tracked path outside the modules as an input, the records of D242 excepted | The Markdown files at the repository's root (no `/` in the path) are records, left out of the inputs digest and of what T4 names as changed; ADR-0006 amended. The root `docs/` stays an input (D242's reason), as do `.nstack/`, `contracts/`, `platform/` and lockfiles. Not taken: a manifest field declaring the root files a module reads, which Turborepo and Nx offer: a second declaration of the module graph, for a case no module has shown | +| D297 | **The lifecycle diagram's `proposed → active` gate promised a check nothing holds** (#553, a consumer project, 2026-11-26: a verifier held §6's four conditions by hand). Measured: manifest and owner are checked for every lifecycle (M1, M2); "contract v1" is false for a leaf module, since 4 of that project's 8 active modules provide none; a creation ADR has no place in the manifest | Docs only, `02-modules.md` §6: the transition is decided by the module's ADR, with a contract at v1 when the module provides one; the table says owner and manifest are checked from `proposed` on. Not taken: a fitness function for the transition, two of its conditions already checked, one false, one needing a new field for a once-per-module event | | v0.6.0 | **What is announced refuses, and the documents say what is true**: D51 to D54, and the documentary lot of the internal audit | **Done (2026-09-20)**: five workstreams merged (#83, #84, #85, #86, #87), **v0.6.0 published**, tag on `8ae544c`, verified on published artefacts — including an update of `tool-library` from v0.5.0, 9 files and no conflict, still compliant. Found doing it: D55. Next: the pilot, and M11 beside it | | Pilot | **`NapkinStack/flet`, the first real project**, run by a session that knew nothing of this repository, with the maintainer as decider and this repository's agent as observer — public on the Free plan, where the whole checklist is available, rather than private on Team where G5 is paid and G6 does not exist | **Set aside by the maintainer, 2026-10-15**, at its cycle boundary; the real product followed since is `summit`. **Ran from 2026-09-20**: discovery decided *go* after three rounds and two independent challenges, charter accepted; cycle 01 closed `stopped/reframed`, **cycle 02 closed** with two deliverables accepted and one deferred (its #27), **cycle 03 framed and approved** (#28, #30), which starts its first `critical` module; the framework taken to v0.6.1 by itself at the boundary (#29), v0.6.2 proposed (#31). It has produced D56 to D63, D68, D70 to D77, replicated D26 and D55, and measured D49 — the first figures on what an independent verifier finds (PDR-0003) | | M11 | **Ceremony follows consequence** (PDR-0011): the framework charges what a failure costs, per module and per project, and states each price before it is paid; with PDR-0004's routing, and PDR-0007, PDR-0008 and PDR-0010 — through to v0.7.0 | **Published as v0.7.0 (2026-10-12).** Planned 2026-09-23 (#98). Merged: **M11f** (#101), **M11a** (#102), **M11b** (#103), **M11d** (#104), **M11e** (#105), **M11c** (#106), **M11h** (#107), **M11g** (#108) closed by its probe — not clean, returned to M13; **M11m** (D68, D74, D75); **M11l** (PDR-0010, D59, D60); **M11n** (D79); **M11o** (PDR-0010 extended: every document has its moment); **M11p** (PDR-0002's three levels given a place: `docs/project/rules/`); **M11j** (PDR-0007: the unframed stage); **M11q** (no folder created empty; PDR-0012 proposed: a project's tree is the project's). **M11k** (PDR-0008's print mode: `nstack settings`; D77, D78). **M11s** (PDR-0012 accepted; the framework's files under `.nstack/`; an update carries what a project adapted); **M11u** (an update rewrites the old addresses a project wrote in its own files, D85). **M11t** (`nstack new-contract`: the contracts module is created by the first contract; PDR-0012 built in full); **M11v** (what the third project found: D81, D82, D83, D86, D87). **M11i**: v0.7.0 published 2026-10-12 (#125, D88). To do: **M11r** PDR-0008's apply mode and D57, after a probe on the real forge; the two earlier projects take v0.7.0 themselves, observed | diff --git a/skeleton/.nstack/handbook/02-modules.md b/skeleton/.nstack/handbook/02-modules.md index 4d993d1..2c03540 100644 --- a/skeleton/.nstack/handbook/02-modules.md +++ b/skeleton/.nstack/handbook/02-modules.md @@ -220,7 +220,7 @@ to break. ```mermaid stateDiagram-v2 [*] --> proposed - proposed --> active : creation ADR
manifest + owner + contract v1 + proposed --> active : its ADR decides it
contract v1, when it provides one active --> maintenance : no further evolution planned
owner kept maintenance --> active : a new need @@ -250,14 +250,17 @@ stateDiagram-v2 end note ``` -The status lives in the manifest, so it is checkable: +The status lives in the manifest, so it is checkable. A module's manifest and its owner are +checked from `proposed` on (M1, M2). Going `active` is a decision: the ADR that creates the +module, read by whoever verifies the pull request. A module that provides no contract, such as a +shell or an installer, goes `active` with none. What CI holds: | Situation | CI result | |---|---| | A frozen contract version of a `maintenance` module changed | **Red** (V1): a version consumed or stable changes only with the merged proof | | A `deprecated` module with a consumer | Reported (B8), and **red** once its removal date has passed (M5) | | A `deprecated` module whose removal date has passed | **Red** (M5) | -| An `active` module with no declared owner | **Red** (M2) | +| A module with no declared owner, whatever its status | **Red** (M2) | This is what avoids **permanent intermediate states**: a deprecated path that never disappears because nobody is responsible for removing it.