Subsystem
Payload
Type of work
Other
Target start date
2026-07-15
Reviewer(s) requested
@OSUSat/osusat-reviewers
What you're about to build
Design the payload hardware block diagram and scope/design the software control framework block diagram.
Which requirement(s) does this satisfy?
Payload Subsystem Info - Next steps (v1r1): Design payload block diagram, Scope software and create block diagram.
Pre-work checklist
Open questions / risks
How is the CM4 interfacing with the camera filter mechanism?
Subsystem
Payload
Type of work
Other
Target start date
2026-07-15
Reviewer(s) requested
@OSUSat/osusat-reviewers
What you're about to build
Design the payload hardware block diagram and scope/design the software control framework block diagram.
Which requirement(s) does this satisfy?
Payload Subsystem Info - Next steps (v1r1): Design payload block diagram, Scope software and create block diagram.
Pre-work checklist
Open questions / risks
How is the CM4 interfacing with the camera filter mechanism?