Subsystem
Payload
Type of work
Other
Target start date
2026-07-15
Reviewer(s) requested
@OSUSat/osusat-reviewers
What you're about to build
Perform real-hardware testing and integrate the payload subsystem into the CubeSat.
Which requirement(s) does this satisfy?
Payload Subsystem Info - Next steps (v1r1): Test on real hardware, Integrate into system.
Pre-work checklist
Open questions / risks
What is the power consumption of the CM4 under heavy image processing loads?
Subsystem
Payload
Type of work
Other
Target start date
2026-07-15
Reviewer(s) requested
@OSUSat/osusat-reviewers
What you're about to build
Perform real-hardware testing and integrate the payload subsystem into the CubeSat.
Which requirement(s) does this satisfy?
Payload Subsystem Info - Next steps (v1r1): Test on real hardware, Integrate into system.
Pre-work checklist
Open questions / risks
What is the power consumption of the CM4 under heavy image processing loads?