[Design Review] [Payload]: Payload v1r1 System Integration & Hardware Testing #106

Description

@FerretCode

Subsystem

Payload

Type of work

Other

Target start date

2026-07-15

Reviewer(s) requested

@OSUSat/osusat-reviewers

What you're about to build

Perform real-hardware testing and integrate the payload subsystem into the CubeSat.

Which requirement(s) does this satisfy?

Payload Subsystem Info - Next steps (v1r1): Test on real hardware, Integrate into system.

Pre-work checklist

  • Relevant subsystem information doc section (mission context, electrical requirements, part tradeoffs) exists and covers this work
  • (Hardware) Relevant part(s) selected with a documented tradeoff, or reusing an already-approved part
  • (Hardware) Derating requirements for any new part identified before layout begins
  • (Hardware) If this touches envelope, mass, power architecture, RBF, deployment switches, or RF: CDS-compliance checklist reviewed
  • (Firmware) Interface sketched out and classified into Question/Command/Loop per the event-driven refactor guideline
  • (Firmware) Proposed event UID(s) checked against the existing UID registry for collisions
  • Known open questions or risks are listed below

Open questions / risks

What is the power consumption of the CM4 under heavy image processing loads?

Metadata

Metadata

Assignees

No one assigned

    Labels

    Type

    No type

    Projects

    Status
    Backlog

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions