List view
Semantic Cognitive System (SCS) β Project Roadmap Start Date: 2026-02-01 Phase 1 β Bootstrap (Temp) + Error Logging Start Date: 2025-02-01 End Date (estimated): TBD Implement Bootstraps β igniter when robot starts up (Use a placeholder for adding features until further development) Implement Error Logging β Centralized error logging system through different channels (ROS/log files)
No due dateβ’4/8 issues closed### Vital Circulatory System (VCS) β Project Roadmap **Start Date:** 2025-12-06 **Phase 1 β Core Communication** **Start Date:** 2025-12-07 **End Date (estimated):** 2026-03-01 - Implement robot β server heartbeat (vital_pulse) via ROS2 topics. - Implement server β robot feedback (vital_feedback) with real-time round-trip measurement. - Establish initial visual heartbeat display for debugging and monitoring. - Validate latency and BPM calculations in a single robot-server setup. **Phase 2 β Multi-Robot Integration** - Extend VCS to handle multiple robots sending pulses simultaneously. - Implement feedback aggregation and per-robot monitoring on the server. - Add dynamic heartbeat adjustment based on system load or latency. - Introduce robot status visualization dashboard on the server. **Phase 3 β System Health & Safety** - Define thresholds for critical delays or missed pulses and generate alerts. - Add automatic re-connection or recovery routines for robot-server communication failures. - Implement logging and analytics for historical heartbeat and latency data. - Integrate system health metrics into the AI decision-making pipeline. **Phase 4 β Advanced Features & Optimization** - Optimize network usage and message payloads for high-frequency updates. - Introduce predictive feedback mechanisms using heartbeat history. - Add security and authentication for robot-server communication. - Prepare documentation, tutorials, and ROS2 launch files for community use. **Phase 5 β Open Source Release** - Finalize code structure and ROS2 package setup. - Publish example deployments with multiple robots and server nodes. - Encourage community contributions, issue reporting, and roadmap suggestions. - Maintain continuous integration (CI) and automated tests for future updates.
Overdue by 15 day(s)β’Due by March 1, 2026β’12/32 issues closed