Story
As a maintainer, before declaring MVP complete, I need a clean-vault walk through the full QA matrix in all three modes.
Tasks
Acceptance Criteria
- 12 × 3 (≈30) QA rows recorded as pass in
plan/QA-log.md.
- Real-doc smoke test passes.
- No outstanding fail rows.
References
Story
As a maintainer, before declaring MVP complete, I need a clean-vault walk through the full QA matrix in all three modes.
Tasks
plan/gfm-fragment-links-plan.md§ QA Matrix in Reading, Live Preview, and Source mode where applicable (≈30 manual checks total).plan/QA-log.md.Acceptance Criteria
plan/QA-log.md.References
plan/gfm-fragment-links-plan.md§ Step 9plan/gfm-fragment-links-plan.md§ QA Matrix