Skip to content

CodeQL

CodeQL #9

Triggered via schedule April 25, 2026 07:20
Status Cancelled
Total duration 1d 0h 46m 35s
Artifacts

codeql.yml

on: schedule
Matrix: analyze
Fit to window
Zoom out
Zoom in

Annotations

4 errors and 1 warning
Analyze (javascript-typescript)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Analyze (actions)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Analyze (java-kotlin)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Analyze (python)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Analyze (swift)
swiftformat 0.61.0 is already installed and up-to-date. To reinstall 0.61.0, run: brew reinstall swiftformat