Skip to content

chore: use uv build to build the package #902

chore: use uv build to build the package

chore: use uv build to build the package #902

Triggered via pull request August 7, 2025 12:43
Status Failure
Total duration 19s
Artifacts

unit-test.yml

on: pull_request
Matrix: test-ubuntu
Fit to window
Zoom out
Zoom in

Annotations

8 errors
test-ubuntu (3.10)
Process completed with exit code 2.
test-ubuntu (3.9)
Process completed with exit code 2.
test-ubuntu (3.13)
Process completed with exit code 2.
test-ubuntu (3.9)
The strategy configuration was canceled because "test-ubuntu._3_13" failed
test-ubuntu (3.11)
Process completed with exit code 2.
test-ubuntu (3.11)
The strategy configuration was canceled because "test-ubuntu._3_13" failed
test-ubuntu (3.12)
The operation was canceled.
test-ubuntu (3.12)
The strategy configuration was canceled because "test-ubuntu._3_13" failed