Goal
Measure and record input-handling performance on the unmodified fork before any SeamGate changes. This baseline is required by the Project Charter (§15) and must be captured before code changes begin.
Metrics to capture (per §15)
Acceptance criteria
Notes
Every subsequent phase gate requires a performance report showing no regression vs this baseline.
Goal
Measure and record input-handling performance on the unmodified fork before any SeamGate changes. This baseline is required by the Project Charter (§15) and must be captured before code changes begin.
Metrics to capture (per §15)
Acceptance criteria
doc/perf-baseline.mdon afeature/perf-baselinebranchphase/0before any code modifications landNotes
Every subsequent phase gate requires a performance report showing no regression vs this baseline.