Skip to content

Upgrade to NeTEx 2.0 schema #47

Upgrade to NeTEx 2.0 schema

Upgrade to NeTEx 2.0 schema #47

Re-run triggered March 12, 2026 09:22
Status Cancelled
Total duration 24s
Artifacts

deploy.yml

on: push
maven-verify
18s
maven-verify
Publish snapshot to Maven Central  /  release
Publish snapshot to Maven Central / release
Fit to window
Zoom out
Zoom in

Annotations

3 errors
maven-verify
The run was canceled by @vpaturet.
maven-verify
The operation was canceled.
Build and Deploy
The run was canceled by @vpaturet.