After all other issues in this mission complete, a single consolidated review is needed to classify every remaining item as complete, external dependency, accepted risk, deferred, or production blocker -- rather than declaring readiness because the dashboard looks polished.
Repository evidence
N/A -- this issue runs last and evaluates the cumulative state of everything else in this milestone.
Risk
P0 -- this is the gate before any real production/Replit deployment recommendation.
Scope
Run every test and quality gate (server + client); desktop and mobile end-to-end tests; wallet tests across MetaMask/Rabby/Phantom EVM; guest-session tests; market-provider failure tests; WS reconnect tests; backtesting correctness tests; paper-execution correctness tests; accessibility tests; dependency/secret scans; production builds; run the production server locally; verify SPA routes, same-origin WS, health/readiness, no live-execution path, disclosures, server-enforced entitlements, Replit docs against actual commands; review unresolved issues; reconcile documentation with implementation.
Non-goals
Not fixing newly discovered defects in this issue itself -- classify them (blocker/deferred/accepted-risk) and open follow-up issues instead, to keep this issue's scope bounded to review+classification.
Dependencies
Every other issue in this milestone (UI-RESP-001 through REPLIT-READY-001).
Proposed implementation
A structured checklist run manually against the actual repo state at that time, producing a docs/production-readiness/backlog.md (or update to the existing plan doc) classifying every item.
Acceptance criteria
Every listed check has been actually run (not assumed) with its result recorded; every open gap has an explicit classification and, where applicable, a linked follow-up issue.
Definition of done
docs/production-readiness/backlog.md published; independent reviewer confirms the classifications match observed repository state, not just the implementer's summary.
Test plan
Full regression run across both packages; this issue's test plan is running every other issue's test suite together and confirming no regressions from integration.
Security review
Confirms no live-trading path was introduced anywhere across the whole mission's changes (structural regression check, ideally backed by a small automated guard rather than only manual review).
Accessibility review
Confirms accessibility requirements from UI-RESP-001/CHART-001/TEST-CLIENT-001 still hold in aggregate.
Observability requirements
Confirms OBS-PROD-001's metrics surface reflects real activity across a full manual walkthrough.
Performance considerations
Cross-references PERF-001's measured numbers for currency.
Rollback plan
N/A -- review/classification only produces documentation, no code change beyond any explicitly-scoped follow-up fixes.
Documentation requirements
docs/production-readiness/backlog.md.
Completion evidence
(added on merge)
Reviewer verdict
(pending)
Problem
After all other issues in this mission complete, a single consolidated review is needed to classify every remaining item as complete, external dependency, accepted risk, deferred, or production blocker -- rather than declaring readiness because the dashboard looks polished.
Repository evidence
N/A -- this issue runs last and evaluates the cumulative state of everything else in this milestone.
Risk
P0 -- this is the gate before any real production/Replit deployment recommendation.
Scope
Run every test and quality gate (server + client); desktop and mobile end-to-end tests; wallet tests across MetaMask/Rabby/Phantom EVM; guest-session tests; market-provider failure tests; WS reconnect tests; backtesting correctness tests; paper-execution correctness tests; accessibility tests; dependency/secret scans; production builds; run the production server locally; verify SPA routes, same-origin WS, health/readiness, no live-execution path, disclosures, server-enforced entitlements, Replit docs against actual commands; review unresolved issues; reconcile documentation with implementation.
Non-goals
Not fixing newly discovered defects in this issue itself -- classify them (blocker/deferred/accepted-risk) and open follow-up issues instead, to keep this issue's scope bounded to review+classification.
Dependencies
Every other issue in this milestone (UI-RESP-001 through REPLIT-READY-001).
Proposed implementation
A structured checklist run manually against the actual repo state at that time, producing a
docs/production-readiness/backlog.md(or update to the existing plan doc) classifying every item.Acceptance criteria
Every listed check has been actually run (not assumed) with its result recorded; every open gap has an explicit classification and, where applicable, a linked follow-up issue.
Definition of done
docs/production-readiness/backlog.mdpublished; independent reviewer confirms the classifications match observed repository state, not just the implementer's summary.Test plan
Full regression run across both packages; this issue's test plan is running every other issue's test suite together and confirming no regressions from integration.
Security review
Confirms no live-trading path was introduced anywhere across the whole mission's changes (structural regression check, ideally backed by a small automated guard rather than only manual review).
Accessibility review
Confirms accessibility requirements from
UI-RESP-001/CHART-001/TEST-CLIENT-001still hold in aggregate.Observability requirements
Confirms
OBS-PROD-001's metrics surface reflects real activity across a full manual walkthrough.Performance considerations
Cross-references
PERF-001's measured numbers for currency.Rollback plan
N/A -- review/classification only produces documentation, no code change beyond any explicitly-scoped follow-up fixes.
Documentation requirements
docs/production-readiness/backlog.md.Completion evidence
(added on merge)
Reviewer verdict
(pending)