Skip to content

wp-worker: order activation H2D on the compute stream under async sub… #64

wp-worker: order activation H2D on the compute stream under async sub…

wp-worker: order activation H2D on the compute stream under async sub… #64

Triggered via push August 31, 2026 00:26
Status Failure
Total duration 1d 0h 0m 1s
Artifacts

build-cpu.yml

on: push
build-cmake-pkg  /  linux
1d 0h
build-cmake-pkg / linux
Matrix: ubuntu
Matrix: windows
Fit to window
Zoom out
Zoom in

Annotations

8 errors
ubuntu (x64, ubuntu-22.04)
Process completed with exit code 2.
ubuntu (arm64, ubuntu-24.04-arm)
The strategy configuration was canceled because "ubuntu.x64_ubuntu-22_04" failed
windows / arm64
Process completed with exit code 1.
windows / x64-openblas
The strategy configuration was canceled because "windows.arm64_arm64_-G__Ninja_Mul" failed
windows / x64-openblas
The operation was canceled.
windows / x64-cpu-static
The strategy configuration was canceled because "windows.arm64_arm64_-G__Ninja_Mul" failed
windows / x64-cpu-static
The operation was canceled.
build-cmake-pkg / linux
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s