Skip to content

chore: add seq_everruns_bridge dependency and update Cargo.lock and C… #41

chore: add seq_everruns_bridge dependency and update Cargo.lock and C…

chore: add seq_everruns_bridge dependency and update Cargo.lock and C… #41

Triggered via push February 19, 2026 20:31
Status Failure
Total duration 26s
Artifacts

canary.yml

on: push
Matrix: build
release
0s
release
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (x86_64-unknown-linux-gnu, ubuntu-latest)
Process completed with exit code 101.
build (x86_64-apple-darwin, macos-latest)
The strategy configuration was canceled because "build.x86_64-unknown-linux-gnu_" failed
build (x86_64-apple-darwin, macos-latest)
The operation was canceled.
build (aarch64-apple-darwin, macos-latest)
The strategy configuration was canceled because "build.x86_64-unknown-linux-gnu_" failed
build (aarch64-apple-darwin, macos-latest)
The operation was canceled.
build (aarch64-unknown-linux-gnu, ubuntu-latest)
The strategy configuration was canceled because "build.x86_64-unknown-linux-gnu_" failed
build (aarch64-unknown-linux-gnu, ubuntu-latest)
The operation was canceled.