Skip to content

vendor: inhouse url and validate upstream patch sync #75

vendor: inhouse url and validate upstream patch sync

vendor: inhouse url and validate upstream patch sync #75

Triggered via push February 22, 2026 18:26
Status Cancelled
Total duration 4m 14s
Artifacts 2

canary.yml

on: push
Matrix: build
build-linux-host-simd
4m 10s
build-linux-host-simd
release
0s
release
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 1 warning
build (aarch64-unknown-linux-gnu, ubuntu-latest)
Canceling since a higher priority waiting request for canary exists
build (aarch64-unknown-linux-gnu, ubuntu-latest)
The operation was canceled.
build (aarch64-apple-darwin, macos-latest)
Canceling since a higher priority waiting request for canary exists
build (aarch64-apple-darwin, macos-latest)
The operation was canceled.
build-linux-host-simd
Canceling since a higher priority waiting request for canary exists
build-linux-host-simd
The operation was canceled.
Canary
Canceling since a higher priority waiting request for canary exists
build (aarch64-unknown-linux-gnu, ubuntu-latest)
Failed to save: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 1

Artifacts

Produced during runtime
Name Size Digest
flow-x86_64-apple-darwin Expired
9.54 MB
sha256:376760681be3753699752158d5963bc78fb29417404b9b6d306d05865df49544
flow-x86_64-unknown-linux-gnu Expired
9.76 MB
sha256:1ef04e3b86313ff7498efbb0040a1ccc3289042a5789c6e3199c7daa4fc1cd64