{
"version": "0.9",
"uri": "https://standard.open-contracting.org/infrastructure/0.9/en/_static/example.json",
"publishedDate": "2018-12-10T15:53:00Z",
"publisher": {
"name": "Open Data Services Co-operative Limited",
"scheme": "GB-COH",
"uid": "9506232",
"uri": "http://data.companieshouse.gov.uk/doc/company/09506232"
},
"license": "http://opendatacommons.org/licenses/pddl/1.0/",
"publicationPolicy": "https://standard.open-contracting.org/1.1/en/implementation/publication_policy/",
"projects": [
{
"id": "oc4ids-bu3kcz-m75-junctions-4-to-5-smart-motorway",
"identifiers": [
{
"id": "M75/SM/4-5",
"scheme": "internal"
}
],
"updated": "2018-12-10T15:53:00Z",
"title": "M75 Junctions 4 to 5 upgrade smart motorway",
"description": "Upgrading the 5km stretch of the M75 near Birmingham Airport, between junction 4 near Patcham and junction 5 at Windlesham, to an all-lane running smart motorway.",
"status": "maintenance",
"period": {
"startDate": "2016-01-01T00:00:00Z",
"endDate": "2018-12-10T00:00:00Z",
"durationInDays": 1074
},
"identificationPeriod": {
"startDate": "2016-01-01T00:00:00Z",
"endDate": "2016-06-30T00:00:00Z"
},
"preparationPeriod": {
"startDate": "2016-07-01T00:00:00Z",
"endDate": "2016-12-31T00:00:00Z"
},
"implementationPeriod": {
"startDate": "2017-01-01T00:00:00Z",
"endDate": "2017-06-30T00:00:00Z"
},
"completionPeriod": {
"startDate": "2017-07-01T00:00:00Z",
"endDate": "2017-12-31T00:00:00Z"
},
"maintenancePeriod": {
"startDate": "2018-01-01T00:00:00Z",
"endDate": "2040-07-01T00:00:00Z"
},
"decommissioningPeriod": {
"startDate": "2040-07-01T00:00:00Z",
"endDate": "2041-06-30T00:00:00Z"
},
"sector": [
"transport",
"transport.road"
],
"additionalClassifications": [
{
"scheme": "COFOG",
"id": "04.5.1",
"description": "Road transport (CS)"
}
],
"type": "expansion",
"purpose": "To help support local economic growth and maintain mobility.",
"relatedProjects": [
{
"id": "1",
"scheme": "oc4ids",
"identifier": "oc4ids-bu3kcz-m75-junctions-4-to-5-construction",
"relationship": "construction",
"title": "Original construction of M75 J4-5"
}
],
"assetLifetime": {
"startDate": "2018-07-01T00:00:00Z",
"endDate": "2040-07-01T00:00:00Z",
"durationInDays": 8027
},
"locations": [
{
"id": "001",
"description": "M75 J4 Patcham Interchange",
"geometry": {
"type": "Point",
"coordinates": [
52.2571843,
-0.1163333
]
},
"gazetteer": {
"scheme": "GEONAMES",
"identifiers": [
"2657507"
]
},
"address": {
"streetAddress": "Patcham Interchange, New Road",
"locality": "Patcham",
"region": "Westshire",
"postalCode": "WS20 5TV",
"countryName": "United Kingdom"
},
"uri": "https://www.openstreetmap.org/node/202995"
},
{
"id": "002",
"description": "M75 J5 Windlesham interchange",
"geometry": {
"type": "Point",
"coordinates": [
52.1373584,
-0.1198955
]
},
"gazetteer": {
"scheme": "OSMN",
"identifiers": [
"https://www.openstreetmap.org/node/26571091"
]
},
"address": {
"streetAddress": "Windlesham Interchange, Old Road",
"locality": "Windlesham",
"region": "Westshire",
"postalCode": "WS21 6RZ",
"countryName": "United Kingdom"
},
"uri": "https://www.openstreetmap.org/node/1638915385"
}
],
"budget": {
"description": "Budget allocation for Motorways UK, aligned with the 2016-2018 strategic plan.",
"amount": {
"amount": 40000000,
"currency": "GBP"
},
"requestDate": "2015-05-30T00:00:00Z",
"approvalDate": "2015-06-24T00:00:00Z",
"budgetBreakdowns": [
{
"id": "1",
"description": "Breakdown by year of implementation",
"budgetBreakdown": [
{
"id": "2016",
"description": "2016 budget allocation",
"amount": {
"amount": 10000000,
"currency": "GBP"
},
"period": {
"startDate": "2016-01-01T00:00:00Z",
"endDate": "2016-12-31T00:00:00Z"
},
"sourceParty": {
"name": "Motorways UK",
"id": "GB-GOR-XX1234"
}
},
{
"id": "2017",
"description": "2017 budget allocation",
"amount": {
"amount": 20000000,
"currency": "GBP"
},
"period": {
"startDate": "2017-01-01T00:00:00Z",
"endDate": "2017-12-31T00:00:00Z"
},
"sourceParty": {
"name": "Motorways UK",
"id": "GB-GOR-XX1234"
}
},
{
"id": "2018",
"description": "2018 budget allocation",
"amount": {
"amount": 10000000,
"currency": "GBP"
},
"period": {
"startDate": "2018-01-01T00:00:00Z",
"endDate": "2018-12-31T00:00:00Z"
},
"sourceParty": {
"name": "Motorways UK",
"id": "GB-GOR-XX1234"
}
}
]
}
],
"finance": [
{
"id": "1",
"assetClass": [
"debt"
],
"type": "loan",
"concessional": true,
"value": {
"amount": 50000000,
"currency": "USD"
},
"source": "Green Climate Fund",
"financingParty": {
"id": "1",
"name": "United Nations Development Programme"
},
"period": {
"startDate": "2024-01-01T00:00:00Z",
"endDate": "2043-12-31T00:00:00Z"
},
"paymentPeriod": {
"startDate": "2029-01-01T00:00:00Z",
"endDate": "2043-12-31T00:00:00Z"
},
"interestRate": {
"margin": 0.0075
},
"description": "Annual principal repayment years 11–20 (% of initial principal): 6.7%. Service fee (per annum): 0.50%. Commitment fee (per annum): Up to 0.75%."
}
]
},
"costMeasurements": [
{
"id": "1",
"date": "2024-05-01T00:00:00Z",
"lifeCycleCosting": {
"value": {
"amount": 10000000,
"currency": "USD"
}
},
"costGroups": [
{
"id": "1",
"category": "endOfLife",
"costs": [
{
"id": "1",
"value": {
"amount": 50000000,
"currency": "USD"
},
"classification": {
"id": "4.02",
"scheme": "icms",
"description": "Decommissioning and decontamination"
}
}
]
}
]
}
],
"parties": [
{
"name": "Motorways UK",
"identifier": {
"scheme": "GB-GOR",
"legalName": "Motorways UK",
"id": "XX1234",
"uri": "https://government-organisation.register.gov.uk/records/XX1234"
},
"additionalIdentifiers": [
{
"scheme": "GB-GOV",
"legalName": "Motorways UK",
"id": "ABCDE"
}
],
"address": {
"postalCode": "LL55 4NY",
"countryName": "United Kingdom",
"streetAddress": "8 Mountain Walk",
"region": "Westshire",
"locality": "Patcham"
},
"contactPoint": {
"name": "Motorways Manager",
"email": "EX12345@motorwaysuk.gov.uk",
"telephone": "+44 0123 456 7890",
"faxNumber": "+44 0123 456 7891"
},
"roles": [
"procuringEntity",
"buyer",
"publicAuthority",
"funder",
"payee"
],
"people": [
{
"id": "1",
"name": "Jane Bloggs",
"jobTitle": "Chair"
}
],
"classifications": [
{
"id": "national",
"scheme": "costIdsAdministrativeLevel"
}
]
},
{
"name": "A1 Expert Smart Moto Design",
"id": "GB-COH-11111111",
"identifier": {
"scheme": "GB-COH",
"id": "11111111",
"legalName": "A1 Expert Smart Moto Design Ltd",
"uri": "https://beta.companieshouse.gov.uk/company/11111111"
},
"address": {
"streetAddress": "Farm Grove, Prince Road",
"locality": "Patcham",
"region": "Westshire",
"postalCode": "WS18 5BW",
"countryName": "United Kingdom"
},
"contactPoint": {
"name": "Kim Designer",
"email": "kim.designerd@a1expertsmart.com",
"telephone": "+44 0123 456 7890",
"url": "https://www.example.com"
},
"roles": [
"supplier",
"tenderer"
]
},
{
"name": "Motorway Design Services PLC",
"id": "GB-COH-12345678",
"identifier": {
"scheme": "GB-COH",
"id": "12345678",
"legalName": "Motorway Design Services PLC",
"uri": "https://beta.companieshouse.gov.uk/company/22222222"
},
"address": {
"streetAddress": "567 High Street",
"locality": "Mareham",
"region": "Eastshire",
"postalCode": "ES22 3TW",
"countryName": "United Kingdom"
},
"roles": [
"tenderer"
]
},
{
"name": "Expert Motorway Supervisors Ltd",
"id": "GB-COH-22222222",
"identifier": {
"scheme": "GB-COH",
"id": "22222222",
"legalName": "Expert Motorway Supervisors Ltd",
"uri": "https://beta.companieshouse.gov.uk/company/22222222"
},
"address": {
"streetAddress": "9 Seaview Road",
"locality": "London",
"region": "London",
"postalCode": "SE1 1EZ",
"countryName": "United Kingdom"
},
"contactPoint": {
"name": "Supervisor Manager",
"email": "supervisor.manager@example.com",
"telephone": "+44 0123 456 7890",
"faxNumber": "+44 0123 456 7891",
"url": "https://www.example.com"
},
"roles": [
"supplier",
"tenderer"
]
},
{
"name": "Concrete Motorways Construction",
"id": "GB-COH-33333333",
"identifier": {
"scheme": "GB-COH",
"id": "33333333",
"legalName": "Concrete Motorways Construction Ltd",
"uri": "https://beta.companieshouse.gov.uk/company/33333333"
},
"address": {
"streetAddress": "5 Example Grove",
"locality": "London",
"region": "London",
"postalCode": "SW1A 1AA",
"countryName": "United Kingdom"
},
"contactPoint": {
"name": "Construction Manager",
"email": "construction.example@example.com",
"telephone": "+44 0123 456 7890",
"faxNumber": "+44 0123 456 7891",
"url": "https://www.example.com"
},
"roles": [
"supplier",
"tenderer"
],
"beneficialOwners": [
{
"id": "1",
"name": "Juan Perez",
"identifier": {
"scheme": "PRY-IDCARD",
"id": "12345"
},
"nationalities": [
"PY"
],
"address": {
"streetAddress": "Avenida Eusebio Ayala 1347",
"locality": "Asunción",
"region": "Gran Asunción",
"postalCode": "1001",
"countryName": "Paraguay"
},
"email": "jperez@example.com",
"faxNumber": "+595210000001",
"telephone": "+595210000000"
}
]
},
{
"name": "Motorways Administrator UK",
"id": "GB-GOR-XX9876",
"identifier": {
"scheme": "GB-GOR",
"legalName": "Motorways Administrator UK",
"id": "XX9876",
"uri": "https://government-organisation.register.gov.uk/records/XX9876"
},
"address": {
"postalCode": "BN18 9AB",
"countryName": "United Kingdom",
"streetAddress": "High Street, Arundel",
"region": "West Sussex"
},
"contactPoint": {
"name": "Motorways Administrator",
"email": "EX6789@motorways-administration-uk.gov.uk",
"telephone": "+44 0678 456 7890",
"faxNumber": "+44 0678 456 7891"
},
"roles": [
"administrativeEntity"
],
"people": [
{
"id": "1",
"name": "Elstra Lovelace",
"jobTitle": "Commercial Contract Officer"
}
]
},
{
"id": "1",
"name": "United Nations Development Programme",
"roles": [
"payer",
"funder"
]
}
],
"publicAuthority": {
"name": "Motorways UK",
"id": "GB-GOR-XX1234"
},
"documents": [
{
"id": "plan-1234",
"documentType": "procurementPlan",
"title": "M75 Junction 4 to 5 Smart Motorway procurement plan.",
"description": "Procurement plan for the M75 Junction 4 to 5 Smart Motorway covering the full life-cycle of the Smart Motorway junction upgrade.",
"url": "https://example.com/he/M75-junctions-4-to-5-smart-motorway/results/M75J4-5+procurement+plan.pdf",
"datePublished": "2016-05-01T00:00:00Z",
"dateModified": "2016-05-11T00:00:00Z",
"format": "application/pdf",
"language": "en",
"author": "Fred Consulter"
},
{
"id": "environmental-impact-5678-r4",
"documentType": "environmentalImpact",
"title": "Environmental Study Report",
"description": "An Environmental Study Report into the M75 Junction 4 to 5 Smart Motorway Upgrade",
"url": "http://example.com/roads/road-projects/M75+junctions+4+to+5++smart+motorway/M75+J4-5SM+Environmental+Study+Report.pdf",
"datePublished": "2016-02-10T00:00:00Z",
"dateModified": "2016-12-15T00:00:00Z",
"format": "application/pdf",
"author": "Jane Environment, Environment Motorway Consultants Ltd."
},
{
"id": "budget-approval-5678",
"documentType": "budgetApproval",
"title": "Approval of Budget for M75 J4-5 upgrade",
"description": "A full budget approval document for the M75 J4-5 upgrade with budgeting for design, build and supervision.",
"url": "http://example.com/roads/road-projects/M75+unctions+4+to+5+budget+approval.pdf",
"datePublished": "2015-10-01T00:00:00Z",
"dateModified": "2018-03-01T00:00:00Z",
"format": "application/pdf",
"author": "UK Motorways Budget Agency",
"pageStart": "55",
"pageEnd": "60",
"accessDetails": "Documents can be inspected in the Motoways UK Example Archive or users can register for free to access."
},
{
"id": "feasibility-study-8976",
"documentType": "feasibilityStudy",
"title": "Feasibility Study for Smart Motorway project: benefits and costs",
"description": "A report commissioned by Motorways UK to carry out initial investigations and site visits to esablish the suitability of upgrading the existing motorway junctions M75 J4-5 to Smart Motorways.\n\nThe survey recorded existing motorway infrastructures and concluded that upgrading to Smart Motorways is feasible. \n\nAdditional design issues are noted in the report.",
"datePublished": "2015-10-10T00:00:00Z",
"format": "application/pdf",
"author": "Feasibility Consultants Example Limited",
"pageStart": "55"
}
],
"forecasts": [
{
"id": "physicalProgress",
"title": "Physical progress",
"observations": [
{
"id": "1",
"measure": "50",
"unit": {
"name": "percent",
"id": "P1",
"scheme": "UNCEFACT"
},
"period": {
"startDate": "2018-01-07T00:00:00Z",
"endDate": "2018-01-07T00:00:00Z"
}
},
{
"id": "2",
"measure": "75",
"unit": {
"name": "percent",
"id": "P1",
"scheme": "UNCEFACT"
},
"period": {
"startDate": "2018-04-07T00:00:00Z",
"endDate": "2018-04-07T00:00:00Z"
}
},
{
"id": "3",
"measure": "100",
"unit": {
"name": "percent",
"id": "P1",
"scheme": "UNCEFACT"
},
"period": {
"startDate": "2018-07-01T00:00:00Z",
"endDate": "2018-07-01T00:00:00Z"
}
}
]
}
],
"metrics": [
{
"id": "physicalProgress",
"title": "Physical progress",
"observations": [
{
"id": "1",
"measure": "50",
"unit": {
"name": "percent",
"id": "P1",
"scheme": "UNCEFACT"
},
"period": {
"startDate": "2018-01-07T00:00:00Z",
"endDate": "2018-01-07T00:00:00Z"
}
},
{
"id": "2",
"measure": "75",
"unit": {
"name": "percent",
"id": "P1",
"scheme": "UNCEFACT"
},
"period": {
"startDate": "2018-08-07T00:00:00Z",
"endDate": "2018-08-07T00:00:00Z"
}
},
{
"id": "3",
"measure": "100",
"unit": {
"name": "percent",
"id": "P1",
"scheme": "UNCEFACT"
},
"period": {
"startDate": "2018-12-01T00:00:00Z",
"endDate": "2018-12-01T00:00:00Z"
}
}
]
}
],
"contractingProcesses": [
{
"id": "ocds-a1b1c1-c9b14c18-adc8-11e6-9901-0019b9f3037b",
"summary": {
"ocid": "ocds-a1b1c1-c9b14c18-adc8-11e6-9901-0019b9f3037b",
"externalReference": "2016-SMP-M75-J4_J5-construction",
"nature": [
"construction"
],
"title": "Smart Motorways Programme - Construction - Package 3 - M75 J8 - 10",
"description": "Collaborative Delivery Framework (CDF) - Lot 3B - Construction £10 to £50m",
"status": "closed",
"tender": {
"procurementMethod": "limited",
"procurementMethodDetails": "Restricted procedure",
"datePublished": "2016-04-01T00:00:00Z",
"costEstimate": {
"amount": 33000000,
"currency": "GBP"
},
"numberOfTenderers": 1,
"tenderers": [
{
"name": "Concrete Motorways Construction",
"id": "GB-COH-33333333"
}
],
"procuringEntity": {
"name": "Motorways UK",
"id": "GB-GOR-XX1234"
},
"administrativeEntity": {
"name": "Motorways Administrator UK",
"id": "GB-GOR-XX9876"
},
"sustainability": [
{
"strategies": [
"awardCriteria"
]
}
]
},
"suppliers": [
{
"name": "Concrete Motorways Construction",
"id": "GB-COH-33333333"
}
],
"contractValue": {
"amount": 29000000,
"currency": "GBP"
},
"contractPeriod": {
"startDate": "2017-07-07T00:00:00Z",
"endDate": "2018-07-01T00:00:00Z"
},
"finalValue": {
"amount": 35250000,
"currency": "GBP"
},
"milestones": [
{
"id": "1",
"title": "Construction payment",
"status": "met",
"dueDate": "2017-08-07T00:00:00Z",
"dateMet": "2017-08-07T00:00:00Z",
"type": "payment",
"value": {
"amount": 1950000,
"currency": "GBP"
}
}
],
"transactions": [
{
"id": "ocds-a1b1c1-c9b14c18-adc8-11e6-9901-0019b9f3037b-00001-1",
"source": "https://openspending.org/motorways-uk-spending/",
"date": "2017-08-07T00:00:00Z",
"value": {
"amount": 1950000,
"currency": "GBP"
},
"payer": {
"id": "GB-GOR-XX1234",
"name": "Motorways UK"
},
"payee": {
"name": "Concrete Motorways Construction",
"id": "GB-COH-33333333"
},
"uri": "https://openspending.org/motorways-uk-spending/transaction/xyz123",
"relatedImplementationMilestone": {
"id": "1",
"title": "Construction payment"
}
}
],
"documents": [
{
"id": "a1b1c1-construction-excavation-report",
"documentType": "physicalProgressReport",
"title": "Report on construction excavation",
"description": "A report on the construction at Junction 5 where excavation damaged a watercourse.",
"url": "https://example.com/Published/a1b1c1-construction-monitoring.html",
"datePublished": "2018-02-01T00:00:00Z",
"dateModified": "2018-02-11T00:00:00Z",
"format": "text/html",
"language": "en",
"accessDetails": "Register for document access.",
"author": "Motorways UK"
},
{
"id": "a1b1c1-construction-completion",
"documentType": "completionCertificate",
"title": "Completion certificate for construction at M75 J4-5 upgrade",
"description": "Completion certificate for the construction upgrading motorway M75 Junctions 4-5.",
"url": "https://example.com/Published/a1b1c1-construction-completion.html",
"datePublished": "2018-12-10T00:00:00Z",
"format": "text/html",
"language": "en",
"accessDetails": "Register for document access.",
"author": "Motorways UK"
}
],
"modifications": [
{
"id": "m27-4-5-construction-modification-001",
"date": "2018-04-01T15:15:00Z",
"description": "Construction extended for 5 months",
"rationale": "Excavation damaged a watercourse. Construction extended for repairs.",
"type": "duration",
"releaseID": "ocds-a1b1c1-c9b14c18-adc8-11e6-9901-0019b9f3037b-cdfpc3b005",
"oldContractPeriod": {
"startDate": "2017-07-07T00:00:00Z",
"endDate": "2018-07-01T00:00:00Z"
},
"newContractPeriod": {
"startDate": "2017-07-07T00:00:00Z",
"endDate": "2018-12-01T00:00:00Z"
}
},
{
"id": "m27-4-5-construction-modification-002",
"date": "2018-04-01T15:15:00Z",
"description": "Construction scope extended to include repairing a watercourse",
"rationale": "Excavation damaged a watercourse. Construction scope extended for repairs.",
"type": "scope",
"releaseID": "ocds-a1b1c1-c9b14c18-adc8-11e6-9901-0019b9f3037b-cdfpc3b0015"
},
{
"id": "m27-4-5-construction-modification-003",
"date": "2018-04-01T15:15:00Z",
"description": "Contract value increased from 29000000 to 35250000 to include repairing a watercourse",
"rationale": "Excavation damaged a watercourse. Construction budget extended for repairs.",
"type": "value",
"releaseID": "ocds-a1b1c1-c9b14c18-adc8-11e6-9901-0019b9f3037b-cdfpc3b0015",
"oldContractValue": {
"amount": 29000000,
"currency": "GBP"
},
"newContractValue": {
"amount": 35250000,
"currency": "GBP"
}
}
],
"social": {
"laborBudget": {
"amount": 150000,
"currency": "USD"
},
"laborObligations": {
"obligations": [
"minimumWage"
],
"description": "The local minimum wage will be paid to all contracted workers."
}
}
},
"releases": [
{
"id": "ocds-a1b1c1-c9b14c18-adc8-11e6-9901-0019b9f3037b-cdfpc3b0011",
"date": "2015-09-16T15:12:32Z",
"tag": [
"tender"
],
"url": "https://example.com/Published/releases/5553-b55.json"
},
{
"id": "ocds-a1b1c1-c9b14c18-adc8-11e6-9901-0019b9f3037b-cdfpc3b0012",
"date": "2015-12-16T15:15:00Z",
"tag": [
"award"
],
"url": "https://example.com/Published/releases/5553-b56.json"
},
{
"id": "ocds-a1b1c1-c9b14c18-adc8-11e6-9901-0019b9f3037b-cdfpc3b0013",
"date": "2015-12-16T15:15:00Z",
"tag": [
"contract"
],
"url": "https://example.com/Published/releases/5553-b57.json"
},
{
"id": "ocds-a1b1c1-c9b14c18-adc8-11e6-9901-0019b9f3037b-cdfpc3b0014",
"date": "2015-12-16T15:15:00Z",
"tag": [
"implementation"
],
"url": "https://example.com/Published/releases/5553-b58.json"
},
{
"id": "ocds-a1b1c1-c9b14c18-adc8-11e6-9901-0019b9f3037b-cdfpc3b0015",
"date": "2018-04-01T15:15:00Z",
"tag": [
"implementationUpdate"
],
"url": "https://example.com/Published/releases/5553-b59.json"
},
{
"id": "ocds-a1b1c1-c9b14c18-adc8-11e6-9901-0019b9f3037b-cdfpc3b0016",
"date": "2018-12-10T09:15:00Z",
"tag": [
"contractTermination"
],
"url": "https://example.com/Published/releases/5553-b60.json"
}
]
},
{
"id": "ocds-a1b1c1-a410a80d-adc8-11e6-9901-0019b9f3037b",
"summary": {
"ocid": "ocds-a1b1c1-a410a80d-adc8-11e6-9901-0019b9f3037b",
"externalReference": "2016-SMP-M75-J4_J5-design",
"nature": [
"design"
],
"title": "Smart Motorway Design M75 J4-5",
"description": "Design of Smart Motorway upgrade M75 J4-5",
"status": "closed",
"tender": {
"procurementMethod": "limited",
"datePublished": "2017-01-01T00:00:00Z",
"procurementMethodDetails": "Restricted procedure",
"costEstimate": {
"amount": 2000000,
"currency": "GBP"
},
"numberOfTenderers": 2,
"tenderers": [
{
"name": "A1 Expert Smart Moto Design",
"id": "GB-COH-11111111"
},
{
"name": "Motorway Design Services PLC",
"id": "GB-COH-12345678"
}
],
"procuringEntity": {
"name": "Motorways UK",
"id": "GB-GOR-XX1234"
},
"administrativeEntity": {
"name": "Motorways Administrator UK",
"id": "GB-GOR-XX9876"
}
},
"suppliers": [
{
"name": "A1 Expert Smart Moto Design",
"id": "GB-COH-11111111"
}
],
"contractValue": {
"amount": 1950000,
"currency": "GBP"
},
"contractPeriod": {
"startDate": "2016-06-01T00:00:00Z",
"endDate": "2017-07-07T00:00:00Z"
},
"finalValue": {
"amount": 1950000,
"currency": "GBP"
},
"documents": [
{
"id": "a1b1c1-tender-doc-001",
"documentType": "tenderNotice",
"title": "M72 improvements at J4-5: Tender Notice",
"description": "A tender notice for the design of improvements to M75 J4-5",
"url": "https://example.com/Published/a1b1c1-design-001.html",
"datePublished": "2015-12-10T16:45:00Z",
"format": "text/html",
"author": "Motorways UK"
}
]
},
"releases": [
{
"id": "ocds-cdf-pc10008",
"date": "2016-04-01T00:00:00Z",
"tag": [
"tender"
],
"url": "https://www.example.com/releases/ocds-cdf-pc10008.json"
},
{
"id": "ocds-cdf-pc10009",
"date": "2016-06-01T15:49:19Z",
"tag": [
"award"
],
"url": "https://www.example.com/releases/ocds-cdf-pc10009.json"
},
{
"id": "ocds-cdf-pc10010",
"date": "2017-08-17T00:00:00Z",
"tag": [
"implementation",
"contractTermination"
],
"url": "https://www.example.com/releases/ocds-cdf-pc10010.json"
}
]
},
{
"id": "ocds-a1b1c1-370ad85a-097f-4b8c-adf8-09d840c7c48b",
"summary": {
"ocid": "ocds-a1b1c1-370ad85a-097f-4b8c-adf8-09d840c7c48b",
"externalReference": "2016-SMP-M75-J4_J5-supervision",
"nature": [
"supervision"
],
"title": "Commercial Management and Assurance for the Motorways Upgrade Programme M75 J4-5",
"description": "Specialist Professional and Technical Services Framework: Commercial Management and Assurance for the Motorways Upgrade Programme M75 J4-5",
"status": "closed",
"tender": {
"procurementMethod": "limited",
"datePublished": "2017-01-01T00:00:00Z",
"procurementMethodDetails": "Framework",
"costEstimate": {
"amount": 5000000,
"currency": "GBP"
},
"numberOfTenderers": 1,
"tenderers": [
{
"name": "Expert Motorway Supervisors",
"id": "GB-COH-22222222"
}
],
"procuringEntity": {
"name": "Motorways UK",
"id": "GB-GOR-XX1234"
},
"administrativeEntity": {
"name": "Motorways Administrator UK",
"id": "GB-GOR-XX9876"
}
},
"suppliers": [
{
"name": "Expert Motorway Supervisors",
"id": "GB-COH-22222222"
}
],
"contractValue": {
"amount": 4900000,
"currency": "GBP"
},
"contractPeriod": {
"startDate": "2017-02-24T00:00:00Z",
"endDate": "2018-10-10T00:00:00Z"
},
"finalValue": {
"amount": 4900000,
"currency": "GBP"
},
"documents": [
{
"id": "a1b1c1-spats-2-033-completion",
"documentType": "completionCertificate",
"title": "Completion Certificate for supervision",
"description": "A completion certificate for Expert Motorway Supervisors supervision of M75 J4-5",
"url": "https://example.com/Published/a1b1c1-spats-2-033-completion.html",
"datePublished": "2018-12-10T16:45:00Z",
"format": "text/html"
}
]
},
"releases": [
{
"id": "ocds-a1b1c1-spats-2-033e",
"date": "2017-03-02T17:14:37Z",
"tag": [
"tender"
],
"url": "https://example.com/releases/ex-a1b1c1--033e.json"
},
{
"id": "ocds-a1b1c1-spats-2-033f",
"date": "2017-05-02T17:14:37Z",
"tag": [
"award"
],
"url": "https://example.com/releases/ex-a1b1c1--033f.json"
},
{
"id": "ocds-a1b1c1-spats-2-033g",
"date": "2017-07-02T17:14:37Z",
"tag": [
"implementation"
],
"url": "https://example.com/Published/releases/ex-a1b1c1--033g.json"
},
{
"id": "ocds-a1b1c1-spats-2-033h",
"date": "2018-12-10T14:45:00Z",
"tag": [
"contractTermination"
],
"url": "https://example.com/releases/ex-a1b1c1--033h.json"
}
]
}
],
"milestones": [
{
"id": "1",
"title": "Grant disbursement",
"status": "met",
"dueDate": "2016-01-01T00:00:00Z",
"dateMet": "2016-01-01T00:00:00Z",
"type": "payment",
"value": {
"amount": 5000000,
"currency": "GBP"
}
}
],
"transactions": [
{
"id": "1",
"date": "2016-01-01T00:00:00Z",
"value": {
"amount": 5000000,
"currency": "GBP"
},
"payer": {
"id": "1",
"name": "United Nations Development Programme"
},
"payee": {
"id": "GB-GOR-XX1234",
"name": "Motorways UK"
},
"relatedImplementationMilestone": {
"id": "1",
"title": "Grant disbursement"
}
}
],
"completion": {
"endDate": "2018-12-10T00:00:00Z",
"endDateDetails": "Construction was delayed due to excavation problems when a watercourse was damaged.",
"finalValue": {
"amount": 42100000,
"currency": "GBP"
},
"finalValueDetails": "Budget increase due to construction delay.",
"finalScope": "Upgrade of Junctions 4 and 5 and repairs to the watercourse at Junction 5.",
"finalScopeDetails": "Scope was expanded to include repairs to a watercourse damaged during construction excavation."
},
"lobbyingMeetings": [
{
"id": "1",
"date": "2024-01-01T00:00:00Z",
"address": {
"streetAddress": "1600 Amphitheatre Pkwy",
"locality": "London",
"region": "London",
"postalCode": "WC1 8HG",
"countryName": "United Kingdom"
},
"numberOfParticipants": 4,
"publicOffice": {
"person": {
"name": "Brett Gliddon"
},
"organization": {
"name": "Motorways UK",
"id": "GB-GOR-XX1234"
},
"jobTitle": "Group General Manager Transport Services"
}
}
],
"social": {
"consultationMeetings": [
{
"id": "1",
"address": {
"streetAddress": "1600 Amphitheatre Pkwy",
"locality": "London",
"region": "London",
"postalCode": "WC1 8HG",
"countryName": "United Kingdom"
},
"date": "2024-01-15T00:00:00Z",
"numberOfParticipants": 25,
"publicOffice": {
"person": {
"name": "Brett Gliddon"
},
"organization": {
"name": "Motorways UK",
"id": "GB-GOR-XX1234"
},
"jobTitle": "Group General Manager Transport Services"
}
}
],
"landCompensationBudget": {
"amount": 10000,
"currency": "USD"
},
"inIndigenousLand": false,
"healthAndSafety": {
"materialTests": {
"tests": [
"masonry",
"metal"
],
"description": "Onsite tests were conducted on the steel frames and masonry according to relevant ASTM International standards."
}
}
},
"environment": {
"goals": [
"climateChangeMitigation"
],
"conservationMeasures": [
{
"type": "locationAnalysis",
"description": "Detailed GIS analysis was undertaken comparing multiple potential locations to select the final project site with the lowest potentially negative ecological impact."
}
],
"environmentalMeasures": [
{
"type": "wasteManagement",
"description": "Waste management plans will be incorporated into all stages of the project to minimize waste produced and ensure unavoidable waste is disposed of in an environmentally responsible manner."
}
],
"climateOversightTypes": [
"internal"
],
"hasImpactAssessment": true,
"impactCategories": [
{
"scheme": "ifcEnvironmentalSocial",
"id": "a"
}
],
"abatementCost": {
"amount": 12.29,
"currency": "USD"
},
"inProtectedArea": true,
"climateMeasures": [
{
"type": [
"regenerativeDesign"
],
"description": "Regenerative design measures for the project include biomimicry to imitate nature."
}
]
},
"policyAlignment": {
"policies": [
"infrastructurePlan"
],
"description": "The project is intended to contribute towards the goals set out in the 2021 Australian Infrastructure Plan."
},
"benefits": [
{
"title": "Environmental",
"description": "The new water management plant will mean less water is removed from the delta meaning more is left in place for use by the local biome.",
"beneficiaries": [
{
"description": "Local population of water plant.",
"numberOfPeople": 1000,
"location": {
"id": "1",
"address": {
"countryName": "United Kingdom"
}
}
}
]
}
]
}
]
}
lib-cove-oc4ids reports structure warnings for array items with missing
ids:{ "structure_warnings": { "missing_ids": [ "projects/0/parties/0/id" ] } }However, the warnings are not reported in the web interface.
This leads to an inconsistency between the self-service feedback that implementers get from using the DRT and the feedback they get from the helpdesk, which is based on the output from lib-cove-oc4ids.
The OCDS DRT does report structure warnings:
Details
Test data
{ "version": "0.9", "uri": "https://standard.open-contracting.org/infrastructure/0.9/en/_static/example.json", "publishedDate": "2018-12-10T15:53:00Z", "publisher": { "name": "Open Data Services Co-operative Limited", "scheme": "GB-COH", "uid": "9506232", "uri": "http://data.companieshouse.gov.uk/doc/company/09506232" }, "license": "http://opendatacommons.org/licenses/pddl/1.0/", "publicationPolicy": "https://standard.open-contracting.org/1.1/en/implementation/publication_policy/", "projects": [ { "id": "oc4ids-bu3kcz-m75-junctions-4-to-5-smart-motorway", "identifiers": [ { "id": "M75/SM/4-5", "scheme": "internal" } ], "updated": "2018-12-10T15:53:00Z", "title": "M75 Junctions 4 to 5 upgrade smart motorway", "description": "Upgrading the 5km stretch of the M75 near Birmingham Airport, between junction 4 near Patcham and junction 5 at Windlesham, to an all-lane running smart motorway.", "status": "maintenance", "period": { "startDate": "2016-01-01T00:00:00Z", "endDate": "2018-12-10T00:00:00Z", "durationInDays": 1074 }, "identificationPeriod": { "startDate": "2016-01-01T00:00:00Z", "endDate": "2016-06-30T00:00:00Z" }, "preparationPeriod": { "startDate": "2016-07-01T00:00:00Z", "endDate": "2016-12-31T00:00:00Z" }, "implementationPeriod": { "startDate": "2017-01-01T00:00:00Z", "endDate": "2017-06-30T00:00:00Z" }, "completionPeriod": { "startDate": "2017-07-01T00:00:00Z", "endDate": "2017-12-31T00:00:00Z" }, "maintenancePeriod": { "startDate": "2018-01-01T00:00:00Z", "endDate": "2040-07-01T00:00:00Z" }, "decommissioningPeriod": { "startDate": "2040-07-01T00:00:00Z", "endDate": "2041-06-30T00:00:00Z" }, "sector": [ "transport", "transport.road" ], "additionalClassifications": [ { "scheme": "COFOG", "id": "04.5.1", "description": "Road transport (CS)" } ], "type": "expansion", "purpose": "To help support local economic growth and maintain mobility.", "relatedProjects": [ { "id": "1", "scheme": "oc4ids", "identifier": "oc4ids-bu3kcz-m75-junctions-4-to-5-construction", "relationship": "construction", "title": "Original construction of M75 J4-5" } ], "assetLifetime": { "startDate": "2018-07-01T00:00:00Z", "endDate": "2040-07-01T00:00:00Z", "durationInDays": 8027 }, "locations": [ { "id": "001", "description": "M75 J4 Patcham Interchange", "geometry": { "type": "Point", "coordinates": [ 52.2571843, -0.1163333 ] }, "gazetteer": { "scheme": "GEONAMES", "identifiers": [ "2657507" ] }, "address": { "streetAddress": "Patcham Interchange, New Road", "locality": "Patcham", "region": "Westshire", "postalCode": "WS20 5TV", "countryName": "United Kingdom" }, "uri": "https://www.openstreetmap.org/node/202995" }, { "id": "002", "description": "M75 J5 Windlesham interchange", "geometry": { "type": "Point", "coordinates": [ 52.1373584, -0.1198955 ] }, "gazetteer": { "scheme": "OSMN", "identifiers": [ "https://www.openstreetmap.org/node/26571091" ] }, "address": { "streetAddress": "Windlesham Interchange, Old Road", "locality": "Windlesham", "region": "Westshire", "postalCode": "WS21 6RZ", "countryName": "United Kingdom" }, "uri": "https://www.openstreetmap.org/node/1638915385" } ], "budget": { "description": "Budget allocation for Motorways UK, aligned with the 2016-2018 strategic plan.", "amount": { "amount": 40000000, "currency": "GBP" }, "requestDate": "2015-05-30T00:00:00Z", "approvalDate": "2015-06-24T00:00:00Z", "budgetBreakdowns": [ { "id": "1", "description": "Breakdown by year of implementation", "budgetBreakdown": [ { "id": "2016", "description": "2016 budget allocation", "amount": { "amount": 10000000, "currency": "GBP" }, "period": { "startDate": "2016-01-01T00:00:00Z", "endDate": "2016-12-31T00:00:00Z" }, "sourceParty": { "name": "Motorways UK", "id": "GB-GOR-XX1234" } }, { "id": "2017", "description": "2017 budget allocation", "amount": { "amount": 20000000, "currency": "GBP" }, "period": { "startDate": "2017-01-01T00:00:00Z", "endDate": "2017-12-31T00:00:00Z" }, "sourceParty": { "name": "Motorways UK", "id": "GB-GOR-XX1234" } }, { "id": "2018", "description": "2018 budget allocation", "amount": { "amount": 10000000, "currency": "GBP" }, "period": { "startDate": "2018-01-01T00:00:00Z", "endDate": "2018-12-31T00:00:00Z" }, "sourceParty": { "name": "Motorways UK", "id": "GB-GOR-XX1234" } } ] } ], "finance": [ { "id": "1", "assetClass": [ "debt" ], "type": "loan", "concessional": true, "value": { "amount": 50000000, "currency": "USD" }, "source": "Green Climate Fund", "financingParty": { "id": "1", "name": "United Nations Development Programme" }, "period": { "startDate": "2024-01-01T00:00:00Z", "endDate": "2043-12-31T00:00:00Z" }, "paymentPeriod": { "startDate": "2029-01-01T00:00:00Z", "endDate": "2043-12-31T00:00:00Z" }, "interestRate": { "margin": 0.0075 }, "description": "Annual principal repayment years 11–20 (% of initial principal): 6.7%. Service fee (per annum): 0.50%. Commitment fee (per annum): Up to 0.75%." } ] }, "costMeasurements": [ { "id": "1", "date": "2024-05-01T00:00:00Z", "lifeCycleCosting": { "value": { "amount": 10000000, "currency": "USD" } }, "costGroups": [ { "id": "1", "category": "endOfLife", "costs": [ { "id": "1", "value": { "amount": 50000000, "currency": "USD" }, "classification": { "id": "4.02", "scheme": "icms", "description": "Decommissioning and decontamination" } } ] } ] } ], "parties": [ { "name": "Motorways UK", "identifier": { "scheme": "GB-GOR", "legalName": "Motorways UK", "id": "XX1234", "uri": "https://government-organisation.register.gov.uk/records/XX1234" }, "additionalIdentifiers": [ { "scheme": "GB-GOV", "legalName": "Motorways UK", "id": "ABCDE" } ], "address": { "postalCode": "LL55 4NY", "countryName": "United Kingdom", "streetAddress": "8 Mountain Walk", "region": "Westshire", "locality": "Patcham" }, "contactPoint": { "name": "Motorways Manager", "email": "EX12345@motorwaysuk.gov.uk", "telephone": "+44 0123 456 7890", "faxNumber": "+44 0123 456 7891" }, "roles": [ "procuringEntity", "buyer", "publicAuthority", "funder", "payee" ], "people": [ { "id": "1", "name": "Jane Bloggs", "jobTitle": "Chair" } ], "classifications": [ { "id": "national", "scheme": "costIdsAdministrativeLevel" } ] }, { "name": "A1 Expert Smart Moto Design", "id": "GB-COH-11111111", "identifier": { "scheme": "GB-COH", "id": "11111111", "legalName": "A1 Expert Smart Moto Design Ltd", "uri": "https://beta.companieshouse.gov.uk/company/11111111" }, "address": { "streetAddress": "Farm Grove, Prince Road", "locality": "Patcham", "region": "Westshire", "postalCode": "WS18 5BW", "countryName": "United Kingdom" }, "contactPoint": { "name": "Kim Designer", "email": "kim.designerd@a1expertsmart.com", "telephone": "+44 0123 456 7890", "url": "https://www.example.com" }, "roles": [ "supplier", "tenderer" ] }, { "name": "Motorway Design Services PLC", "id": "GB-COH-12345678", "identifier": { "scheme": "GB-COH", "id": "12345678", "legalName": "Motorway Design Services PLC", "uri": "https://beta.companieshouse.gov.uk/company/22222222" }, "address": { "streetAddress": "567 High Street", "locality": "Mareham", "region": "Eastshire", "postalCode": "ES22 3TW", "countryName": "United Kingdom" }, "roles": [ "tenderer" ] }, { "name": "Expert Motorway Supervisors Ltd", "id": "GB-COH-22222222", "identifier": { "scheme": "GB-COH", "id": "22222222", "legalName": "Expert Motorway Supervisors Ltd", "uri": "https://beta.companieshouse.gov.uk/company/22222222" }, "address": { "streetAddress": "9 Seaview Road", "locality": "London", "region": "London", "postalCode": "SE1 1EZ", "countryName": "United Kingdom" }, "contactPoint": { "name": "Supervisor Manager", "email": "supervisor.manager@example.com", "telephone": "+44 0123 456 7890", "faxNumber": "+44 0123 456 7891", "url": "https://www.example.com" }, "roles": [ "supplier", "tenderer" ] }, { "name": "Concrete Motorways Construction", "id": "GB-COH-33333333", "identifier": { "scheme": "GB-COH", "id": "33333333", "legalName": "Concrete Motorways Construction Ltd", "uri": "https://beta.companieshouse.gov.uk/company/33333333" }, "address": { "streetAddress": "5 Example Grove", "locality": "London", "region": "London", "postalCode": "SW1A 1AA", "countryName": "United Kingdom" }, "contactPoint": { "name": "Construction Manager", "email": "construction.example@example.com", "telephone": "+44 0123 456 7890", "faxNumber": "+44 0123 456 7891", "url": "https://www.example.com" }, "roles": [ "supplier", "tenderer" ], "beneficialOwners": [ { "id": "1", "name": "Juan Perez", "identifier": { "scheme": "PRY-IDCARD", "id": "12345" }, "nationalities": [ "PY" ], "address": { "streetAddress": "Avenida Eusebio Ayala 1347", "locality": "Asunción", "region": "Gran Asunción", "postalCode": "1001", "countryName": "Paraguay" }, "email": "jperez@example.com", "faxNumber": "+595210000001", "telephone": "+595210000000" } ] }, { "name": "Motorways Administrator UK", "id": "GB-GOR-XX9876", "identifier": { "scheme": "GB-GOR", "legalName": "Motorways Administrator UK", "id": "XX9876", "uri": "https://government-organisation.register.gov.uk/records/XX9876" }, "address": { "postalCode": "BN18 9AB", "countryName": "United Kingdom", "streetAddress": "High Street, Arundel", "region": "West Sussex" }, "contactPoint": { "name": "Motorways Administrator", "email": "EX6789@motorways-administration-uk.gov.uk", "telephone": "+44 0678 456 7890", "faxNumber": "+44 0678 456 7891" }, "roles": [ "administrativeEntity" ], "people": [ { "id": "1", "name": "Elstra Lovelace", "jobTitle": "Commercial Contract Officer" } ] }, { "id": "1", "name": "United Nations Development Programme", "roles": [ "payer", "funder" ] } ], "publicAuthority": { "name": "Motorways UK", "id": "GB-GOR-XX1234" }, "documents": [ { "id": "plan-1234", "documentType": "procurementPlan", "title": "M75 Junction 4 to 5 Smart Motorway procurement plan.", "description": "Procurement plan for the M75 Junction 4 to 5 Smart Motorway covering the full life-cycle of the Smart Motorway junction upgrade.", "url": "https://example.com/he/M75-junctions-4-to-5-smart-motorway/results/M75J4-5+procurement+plan.pdf", "datePublished": "2016-05-01T00:00:00Z", "dateModified": "2016-05-11T00:00:00Z", "format": "application/pdf", "language": "en", "author": "Fred Consulter" }, { "id": "environmental-impact-5678-r4", "documentType": "environmentalImpact", "title": "Environmental Study Report", "description": "An Environmental Study Report into the M75 Junction 4 to 5 Smart Motorway Upgrade", "url": "http://example.com/roads/road-projects/M75+junctions+4+to+5++smart+motorway/M75+J4-5SM+Environmental+Study+Report.pdf", "datePublished": "2016-02-10T00:00:00Z", "dateModified": "2016-12-15T00:00:00Z", "format": "application/pdf", "author": "Jane Environment, Environment Motorway Consultants Ltd." }, { "id": "budget-approval-5678", "documentType": "budgetApproval", "title": "Approval of Budget for M75 J4-5 upgrade", "description": "A full budget approval document for the M75 J4-5 upgrade with budgeting for design, build and supervision.", "url": "http://example.com/roads/road-projects/M75+unctions+4+to+5+budget+approval.pdf", "datePublished": "2015-10-01T00:00:00Z", "dateModified": "2018-03-01T00:00:00Z", "format": "application/pdf", "author": "UK Motorways Budget Agency", "pageStart": "55", "pageEnd": "60", "accessDetails": "Documents can be inspected in the Motoways UK Example Archive or users can register for free to access." }, { "id": "feasibility-study-8976", "documentType": "feasibilityStudy", "title": "Feasibility Study for Smart Motorway project: benefits and costs", "description": "A report commissioned by Motorways UK to carry out initial investigations and site visits to esablish the suitability of upgrading the existing motorway junctions M75 J4-5 to Smart Motorways.\n\nThe survey recorded existing motorway infrastructures and concluded that upgrading to Smart Motorways is feasible. \n\nAdditional design issues are noted in the report.", "datePublished": "2015-10-10T00:00:00Z", "format": "application/pdf", "author": "Feasibility Consultants Example Limited", "pageStart": "55" } ], "forecasts": [ { "id": "physicalProgress", "title": "Physical progress", "observations": [ { "id": "1", "measure": "50", "unit": { "name": "percent", "id": "P1", "scheme": "UNCEFACT" }, "period": { "startDate": "2018-01-07T00:00:00Z", "endDate": "2018-01-07T00:00:00Z" } }, { "id": "2", "measure": "75", "unit": { "name": "percent", "id": "P1", "scheme": "UNCEFACT" }, "period": { "startDate": "2018-04-07T00:00:00Z", "endDate": "2018-04-07T00:00:00Z" } }, { "id": "3", "measure": "100", "unit": { "name": "percent", "id": "P1", "scheme": "UNCEFACT" }, "period": { "startDate": "2018-07-01T00:00:00Z", "endDate": "2018-07-01T00:00:00Z" } } ] } ], "metrics": [ { "id": "physicalProgress", "title": "Physical progress", "observations": [ { "id": "1", "measure": "50", "unit": { "name": "percent", "id": "P1", "scheme": "UNCEFACT" }, "period": { "startDate": "2018-01-07T00:00:00Z", "endDate": "2018-01-07T00:00:00Z" } }, { "id": "2", "measure": "75", "unit": { "name": "percent", "id": "P1", "scheme": "UNCEFACT" }, "period": { "startDate": "2018-08-07T00:00:00Z", "endDate": "2018-08-07T00:00:00Z" } }, { "id": "3", "measure": "100", "unit": { "name": "percent", "id": "P1", "scheme": "UNCEFACT" }, "period": { "startDate": "2018-12-01T00:00:00Z", "endDate": "2018-12-01T00:00:00Z" } } ] } ], "contractingProcesses": [ { "id": "ocds-a1b1c1-c9b14c18-adc8-11e6-9901-0019b9f3037b", "summary": { "ocid": "ocds-a1b1c1-c9b14c18-adc8-11e6-9901-0019b9f3037b", "externalReference": "2016-SMP-M75-J4_J5-construction", "nature": [ "construction" ], "title": "Smart Motorways Programme - Construction - Package 3 - M75 J8 - 10", "description": "Collaborative Delivery Framework (CDF) - Lot 3B - Construction £10 to £50m", "status": "closed", "tender": { "procurementMethod": "limited", "procurementMethodDetails": "Restricted procedure", "datePublished": "2016-04-01T00:00:00Z", "costEstimate": { "amount": 33000000, "currency": "GBP" }, "numberOfTenderers": 1, "tenderers": [ { "name": "Concrete Motorways Construction", "id": "GB-COH-33333333" } ], "procuringEntity": { "name": "Motorways UK", "id": "GB-GOR-XX1234" }, "administrativeEntity": { "name": "Motorways Administrator UK", "id": "GB-GOR-XX9876" }, "sustainability": [ { "strategies": [ "awardCriteria" ] } ] }, "suppliers": [ { "name": "Concrete Motorways Construction", "id": "GB-COH-33333333" } ], "contractValue": { "amount": 29000000, "currency": "GBP" }, "contractPeriod": { "startDate": "2017-07-07T00:00:00Z", "endDate": "2018-07-01T00:00:00Z" }, "finalValue": { "amount": 35250000, "currency": "GBP" }, "milestones": [ { "id": "1", "title": "Construction payment", "status": "met", "dueDate": "2017-08-07T00:00:00Z", "dateMet": "2017-08-07T00:00:00Z", "type": "payment", "value": { "amount": 1950000, "currency": "GBP" } } ], "transactions": [ { "id": "ocds-a1b1c1-c9b14c18-adc8-11e6-9901-0019b9f3037b-00001-1", "source": "https://openspending.org/motorways-uk-spending/", "date": "2017-08-07T00:00:00Z", "value": { "amount": 1950000, "currency": "GBP" }, "payer": { "id": "GB-GOR-XX1234", "name": "Motorways UK" }, "payee": { "name": "Concrete Motorways Construction", "id": "GB-COH-33333333" }, "uri": "https://openspending.org/motorways-uk-spending/transaction/xyz123", "relatedImplementationMilestone": { "id": "1", "title": "Construction payment" } } ], "documents": [ { "id": "a1b1c1-construction-excavation-report", "documentType": "physicalProgressReport", "title": "Report on construction excavation", "description": "A report on the construction at Junction 5 where excavation damaged a watercourse.", "url": "https://example.com/Published/a1b1c1-construction-monitoring.html", "datePublished": "2018-02-01T00:00:00Z", "dateModified": "2018-02-11T00:00:00Z", "format": "text/html", "language": "en", "accessDetails": "Register for document access.", "author": "Motorways UK" }, { "id": "a1b1c1-construction-completion", "documentType": "completionCertificate", "title": "Completion certificate for construction at M75 J4-5 upgrade", "description": "Completion certificate for the construction upgrading motorway M75 Junctions 4-5.", "url": "https://example.com/Published/a1b1c1-construction-completion.html", "datePublished": "2018-12-10T00:00:00Z", "format": "text/html", "language": "en", "accessDetails": "Register for document access.", "author": "Motorways UK" } ], "modifications": [ { "id": "m27-4-5-construction-modification-001", "date": "2018-04-01T15:15:00Z", "description": "Construction extended for 5 months", "rationale": "Excavation damaged a watercourse. Construction extended for repairs.", "type": "duration", "releaseID": "ocds-a1b1c1-c9b14c18-adc8-11e6-9901-0019b9f3037b-cdfpc3b005", "oldContractPeriod": { "startDate": "2017-07-07T00:00:00Z", "endDate": "2018-07-01T00:00:00Z" }, "newContractPeriod": { "startDate": "2017-07-07T00:00:00Z", "endDate": "2018-12-01T00:00:00Z" } }, { "id": "m27-4-5-construction-modification-002", "date": "2018-04-01T15:15:00Z", "description": "Construction scope extended to include repairing a watercourse", "rationale": "Excavation damaged a watercourse. Construction scope extended for repairs.", "type": "scope", "releaseID": "ocds-a1b1c1-c9b14c18-adc8-11e6-9901-0019b9f3037b-cdfpc3b0015" }, { "id": "m27-4-5-construction-modification-003", "date": "2018-04-01T15:15:00Z", "description": "Contract value increased from 29000000 to 35250000 to include repairing a watercourse", "rationale": "Excavation damaged a watercourse. Construction budget extended for repairs.", "type": "value", "releaseID": "ocds-a1b1c1-c9b14c18-adc8-11e6-9901-0019b9f3037b-cdfpc3b0015", "oldContractValue": { "amount": 29000000, "currency": "GBP" }, "newContractValue": { "amount": 35250000, "currency": "GBP" } } ], "social": { "laborBudget": { "amount": 150000, "currency": "USD" }, "laborObligations": { "obligations": [ "minimumWage" ], "description": "The local minimum wage will be paid to all contracted workers." } } }, "releases": [ { "id": "ocds-a1b1c1-c9b14c18-adc8-11e6-9901-0019b9f3037b-cdfpc3b0011", "date": "2015-09-16T15:12:32Z", "tag": [ "tender" ], "url": "https://example.com/Published/releases/5553-b55.json" }, { "id": "ocds-a1b1c1-c9b14c18-adc8-11e6-9901-0019b9f3037b-cdfpc3b0012", "date": "2015-12-16T15:15:00Z", "tag": [ "award" ], "url": "https://example.com/Published/releases/5553-b56.json" }, { "id": "ocds-a1b1c1-c9b14c18-adc8-11e6-9901-0019b9f3037b-cdfpc3b0013", "date": "2015-12-16T15:15:00Z", "tag": [ "contract" ], "url": "https://example.com/Published/releases/5553-b57.json" }, { "id": "ocds-a1b1c1-c9b14c18-adc8-11e6-9901-0019b9f3037b-cdfpc3b0014", "date": "2015-12-16T15:15:00Z", "tag": [ "implementation" ], "url": "https://example.com/Published/releases/5553-b58.json" }, { "id": "ocds-a1b1c1-c9b14c18-adc8-11e6-9901-0019b9f3037b-cdfpc3b0015", "date": "2018-04-01T15:15:00Z", "tag": [ "implementationUpdate" ], "url": "https://example.com/Published/releases/5553-b59.json" }, { "id": "ocds-a1b1c1-c9b14c18-adc8-11e6-9901-0019b9f3037b-cdfpc3b0016", "date": "2018-12-10T09:15:00Z", "tag": [ "contractTermination" ], "url": "https://example.com/Published/releases/5553-b60.json" } ] }, { "id": "ocds-a1b1c1-a410a80d-adc8-11e6-9901-0019b9f3037b", "summary": { "ocid": "ocds-a1b1c1-a410a80d-adc8-11e6-9901-0019b9f3037b", "externalReference": "2016-SMP-M75-J4_J5-design", "nature": [ "design" ], "title": "Smart Motorway Design M75 J4-5", "description": "Design of Smart Motorway upgrade M75 J4-5", "status": "closed", "tender": { "procurementMethod": "limited", "datePublished": "2017-01-01T00:00:00Z", "procurementMethodDetails": "Restricted procedure", "costEstimate": { "amount": 2000000, "currency": "GBP" }, "numberOfTenderers": 2, "tenderers": [ { "name": "A1 Expert Smart Moto Design", "id": "GB-COH-11111111" }, { "name": "Motorway Design Services PLC", "id": "GB-COH-12345678" } ], "procuringEntity": { "name": "Motorways UK", "id": "GB-GOR-XX1234" }, "administrativeEntity": { "name": "Motorways Administrator UK", "id": "GB-GOR-XX9876" } }, "suppliers": [ { "name": "A1 Expert Smart Moto Design", "id": "GB-COH-11111111" } ], "contractValue": { "amount": 1950000, "currency": "GBP" }, "contractPeriod": { "startDate": "2016-06-01T00:00:00Z", "endDate": "2017-07-07T00:00:00Z" }, "finalValue": { "amount": 1950000, "currency": "GBP" }, "documents": [ { "id": "a1b1c1-tender-doc-001", "documentType": "tenderNotice", "title": "M72 improvements at J4-5: Tender Notice", "description": "A tender notice for the design of improvements to M75 J4-5", "url": "https://example.com/Published/a1b1c1-design-001.html", "datePublished": "2015-12-10T16:45:00Z", "format": "text/html", "author": "Motorways UK" } ] }, "releases": [ { "id": "ocds-cdf-pc10008", "date": "2016-04-01T00:00:00Z", "tag": [ "tender" ], "url": "https://www.example.com/releases/ocds-cdf-pc10008.json" }, { "id": "ocds-cdf-pc10009", "date": "2016-06-01T15:49:19Z", "tag": [ "award" ], "url": "https://www.example.com/releases/ocds-cdf-pc10009.json" }, { "id": "ocds-cdf-pc10010", "date": "2017-08-17T00:00:00Z", "tag": [ "implementation", "contractTermination" ], "url": "https://www.example.com/releases/ocds-cdf-pc10010.json" } ] }, { "id": "ocds-a1b1c1-370ad85a-097f-4b8c-adf8-09d840c7c48b", "summary": { "ocid": "ocds-a1b1c1-370ad85a-097f-4b8c-adf8-09d840c7c48b", "externalReference": "2016-SMP-M75-J4_J5-supervision", "nature": [ "supervision" ], "title": "Commercial Management and Assurance for the Motorways Upgrade Programme M75 J4-5", "description": "Specialist Professional and Technical Services Framework: Commercial Management and Assurance for the Motorways Upgrade Programme M75 J4-5", "status": "closed", "tender": { "procurementMethod": "limited", "datePublished": "2017-01-01T00:00:00Z", "procurementMethodDetails": "Framework", "costEstimate": { "amount": 5000000, "currency": "GBP" }, "numberOfTenderers": 1, "tenderers": [ { "name": "Expert Motorway Supervisors", "id": "GB-COH-22222222" } ], "procuringEntity": { "name": "Motorways UK", "id": "GB-GOR-XX1234" }, "administrativeEntity": { "name": "Motorways Administrator UK", "id": "GB-GOR-XX9876" } }, "suppliers": [ { "name": "Expert Motorway Supervisors", "id": "GB-COH-22222222" } ], "contractValue": { "amount": 4900000, "currency": "GBP" }, "contractPeriod": { "startDate": "2017-02-24T00:00:00Z", "endDate": "2018-10-10T00:00:00Z" }, "finalValue": { "amount": 4900000, "currency": "GBP" }, "documents": [ { "id": "a1b1c1-spats-2-033-completion", "documentType": "completionCertificate", "title": "Completion Certificate for supervision", "description": "A completion certificate for Expert Motorway Supervisors supervision of M75 J4-5", "url": "https://example.com/Published/a1b1c1-spats-2-033-completion.html", "datePublished": "2018-12-10T16:45:00Z", "format": "text/html" } ] }, "releases": [ { "id": "ocds-a1b1c1-spats-2-033e", "date": "2017-03-02T17:14:37Z", "tag": [ "tender" ], "url": "https://example.com/releases/ex-a1b1c1--033e.json" }, { "id": "ocds-a1b1c1-spats-2-033f", "date": "2017-05-02T17:14:37Z", "tag": [ "award" ], "url": "https://example.com/releases/ex-a1b1c1--033f.json" }, { "id": "ocds-a1b1c1-spats-2-033g", "date": "2017-07-02T17:14:37Z", "tag": [ "implementation" ], "url": "https://example.com/Published/releases/ex-a1b1c1--033g.json" }, { "id": "ocds-a1b1c1-spats-2-033h", "date": "2018-12-10T14:45:00Z", "tag": [ "contractTermination" ], "url": "https://example.com/releases/ex-a1b1c1--033h.json" } ] } ], "milestones": [ { "id": "1", "title": "Grant disbursement", "status": "met", "dueDate": "2016-01-01T00:00:00Z", "dateMet": "2016-01-01T00:00:00Z", "type": "payment", "value": { "amount": 5000000, "currency": "GBP" } } ], "transactions": [ { "id": "1", "date": "2016-01-01T00:00:00Z", "value": { "amount": 5000000, "currency": "GBP" }, "payer": { "id": "1", "name": "United Nations Development Programme" }, "payee": { "id": "GB-GOR-XX1234", "name": "Motorways UK" }, "relatedImplementationMilestone": { "id": "1", "title": "Grant disbursement" } } ], "completion": { "endDate": "2018-12-10T00:00:00Z", "endDateDetails": "Construction was delayed due to excavation problems when a watercourse was damaged.", "finalValue": { "amount": 42100000, "currency": "GBP" }, "finalValueDetails": "Budget increase due to construction delay.", "finalScope": "Upgrade of Junctions 4 and 5 and repairs to the watercourse at Junction 5.", "finalScopeDetails": "Scope was expanded to include repairs to a watercourse damaged during construction excavation." }, "lobbyingMeetings": [ { "id": "1", "date": "2024-01-01T00:00:00Z", "address": { "streetAddress": "1600 Amphitheatre Pkwy", "locality": "London", "region": "London", "postalCode": "WC1 8HG", "countryName": "United Kingdom" }, "numberOfParticipants": 4, "publicOffice": { "person": { "name": "Brett Gliddon" }, "organization": { "name": "Motorways UK", "id": "GB-GOR-XX1234" }, "jobTitle": "Group General Manager Transport Services" } } ], "social": { "consultationMeetings": [ { "id": "1", "address": { "streetAddress": "1600 Amphitheatre Pkwy", "locality": "London", "region": "London", "postalCode": "WC1 8HG", "countryName": "United Kingdom" }, "date": "2024-01-15T00:00:00Z", "numberOfParticipants": 25, "publicOffice": { "person": { "name": "Brett Gliddon" }, "organization": { "name": "Motorways UK", "id": "GB-GOR-XX1234" }, "jobTitle": "Group General Manager Transport Services" } } ], "landCompensationBudget": { "amount": 10000, "currency": "USD" }, "inIndigenousLand": false, "healthAndSafety": { "materialTests": { "tests": [ "masonry", "metal" ], "description": "Onsite tests were conducted on the steel frames and masonry according to relevant ASTM International standards." } } }, "environment": { "goals": [ "climateChangeMitigation" ], "conservationMeasures": [ { "type": "locationAnalysis", "description": "Detailed GIS analysis was undertaken comparing multiple potential locations to select the final project site with the lowest potentially negative ecological impact." } ], "environmentalMeasures": [ { "type": "wasteManagement", "description": "Waste management plans will be incorporated into all stages of the project to minimize waste produced and ensure unavoidable waste is disposed of in an environmentally responsible manner." } ], "climateOversightTypes": [ "internal" ], "hasImpactAssessment": true, "impactCategories": [ { "scheme": "ifcEnvironmentalSocial", "id": "a" } ], "abatementCost": { "amount": 12.29, "currency": "USD" }, "inProtectedArea": true, "climateMeasures": [ { "type": [ "regenerativeDesign" ], "description": "Regenerative design measures for the project include biomimicry to imitate nature." } ] }, "policyAlignment": { "policies": [ "infrastructurePlan" ], "description": "The project is intended to contribute towards the goals set out in the 2021 Australian Infrastructure Plan." }, "benefits": [ { "title": "Environmental", "description": "The new water management plant will mean less water is removed from the delta meaning more is left in place for use by the local biome.", "beneficiaries": [ { "description": "Local population of water plant.", "numberOfPeople": 1000, "location": { "id": "1", "address": { "countryName": "United Kingdom" } } } ] } ] } ] }cc @neelima-j