Skip to content

Stage 4: integrate reserved toolbar handoffs, job control, and resize recovery #1359

Stage 4: integrate reserved toolbar handoffs, job control, and resize recovery

Stage 4: integrate reserved toolbar handoffs, job control, and resize recovery #1359

Triggered via pull request September 12, 2026 20:09
Status Failure
Total duration 3m 42s
Artifacts

tests.yml

on: pull_request
Matrix: tests
All Tests Passed
3s
All Tests Passed
Fit to window
Zoom out
Zoom in

Annotations

9 errors
tests (macos-latest, 3.12)
Process completed with exit code 1.
tests (macos-latest, 3.14t)
Process completed with exit code 1.
tests (ubuntu-latest, 3.12)
Process completed with exit code 1.
tests (ubuntu-latest, 3.13)
Process completed with exit code 1.
tests (ubuntu-latest, 3.15-dev)
Process completed with exit code 1.
tests (ubuntu-latest, 3.11)
Process completed with exit code 1.
tests (ubuntu-latest, 3.14t)
Process completed with exit code 1.
tests (ubuntu-latest, 3.14)
Process completed with exit code 1.
All Tests Passed
Process completed with exit code 1.