Skip to content

Stage 4: integrate reserved toolbar handoffs, job control, and resize recovery #1370

Stage 4: integrate reserved toolbar handoffs, job control, and resize recovery

Stage 4: integrate reserved toolbar handoffs, job control, and resize recovery #1370

Triggered via pull request September 14, 2026 17:49
Status Failure
Total duration 2m 11s
Artifacts

tests.yml

on: pull_request
Matrix: tests
All Tests Passed
4s
All Tests Passed
Fit to window
Zoom out
Zoom in

Annotations

3 errors
tests (macos-latest, 3.13)
Process completed with exit code 1.
tests (windows-latest, 3.12)
Process completed with exit code 1.
All Tests Passed
Process completed with exit code 1.