the GROUP syntax for grouping keywords and control structures is not mentionned in the syllabus
*** Test Cases ***
Example
GROUP Setup phase
Step 1
Step 2
END
GROUP Verification phase
Check Result
END
not sure if it should be covered at RFCP level or deferred to RFCE?
the GROUP syntax for grouping keywords and control structures is not mentionned in the syllabus
not sure if it should be covered at RFCP level or deferred to RFCE?