Issue
We are seeing a channel with 1-2 confirmations be shown as having 0 on the UI - until it reaches the third confirmation - that's with CLN as the backend node.
3 confirmation is when CLN marked the channel as "ready for use" and then the respective local remote.
Issue
We are seeing a channel with 1-2 confirmations be shown as having 0 on the UI - until it reaches the third confirmation - that's with CLN as the backend node.
3 confirmation is when CLN marked the channel as "ready for use" and then the respective local remote.