Skip to content

Latest commit

 

History

History
361 lines (288 loc) · 10.2 KB

File metadata and controls

361 lines (288 loc) · 10.2 KB

Sheet Scanner - Task Assignments & Status

Status: In Progress (Phase 1 underway)
Last Updated: 2025-12-06


Overview

Sheet Scanner is decomposed into 5 phases with 33 total tasks:

Phase Status Tasks Priority Dependencies
Phase 1: Foundations IN PROGRESS 7 P1 None (base layer)
Phase 2: Mobile OCR Open 5 P1 Phase 1
Phase 3: Desktop Workflow Open 7 P1 Phase 1
Phase 4: Search & Filtering Open 4 P1 Phase 1
Phase 5: Backup & Polish Open 5 P1 All phases

Phase 1: Foundations (CRITICAL PATH)

Owner: Core/Lead Agent
Timeline: Weeks 1-2
Status: IN PROGRESS (BlackCreek started, FuchsiaPond coordinating)

Tasks

1. sheet-scanner-dtj - Project Structure & Clean Architecture Setup

  • Status: ✅ COMPLETED
  • Effort: 2-3 hours
  • Dependencies: None (start first)
  • Deliverables:
    • Complete Flutter project structure
    • Clean Architecture folder hierarchy
    • Feature-based organization
    • Core layer foundation

2. sheet-scanner-us8 - Domain Entities (SheetMusic, Tag, Composer)

  • Status: TODO
  • Effort: 1-2 hours
  • Dependencies: dtj
  • Deliverables:
    • SheetMusic entity class (id, title, composer, notes, imageUrls, tags, createdAt, updatedAt)
    • Tag entity class (id, name, count)
    • Composer entity class (id, name, count)
    • Value equality and immutability
    • Documentation comments

3. sheet-scanner-9uw - Drift Database with FTS5 Support

  • Status: TODO
  • Effort: 3-4 hours
  • Dependencies: us8
  • Deliverables:
    • Drift database setup with sqlite3_flutter_libs
    • Tables: sheet_music, tags, sheet_music_tags, sheet_music_fts
    • FTS5 virtual table for full-text search
    • Migrations framework
    • Database initialization

4. sheet-scanner-t42 - Repository Pattern Interfaces

  • Status: TODO
  • Effort: 1-2 hours
  • Dependencies: us8
  • Deliverables:
    • Abstract repository interfaces
    • Either/Result type usage
    • Failure handling contracts
    • Interfaces: SheetMusicRepository, TagRepository, OCRRepository, SearchRepository, BackupRepository

5. sheet-scanner-24w - get_it Dependency Injection Setup

  • Status: TODO
  • Effort: 1-2 hours
  • Dependencies: dtj, 9uw
  • Deliverables:
    • Service locator configuration
    • Repository registration
    • DataSource registration
    • UseCase registration
    • Factory setup & lazy singletons

6. sheet-scanner-2yi - Image Storage System with path_provider

  • Status: TODO
  • Effort: 1-2 hours
  • Dependencies: dtj
  • Deliverables:
    • Image directory initialization
    • Image save/load functionality
    • File naming strategy
    • Cleanup utilities
    • Error handling

7. sheet-scanner-hpe - App Shell & Navigation Skeleton

  • Status: TODO
  • Effort: 2-3 hours
  • Dependencies: dtj
  • Deliverables:
    • GoRouter setup with declarative routing
    • Navigation structure (mobile & desktop)
    • Placeholder screens: /, /scan, /browse, /search, /detail/:id, /settings
    • Error screen

Phase 2: Mobile OCR

Owner: Mobile/OCR Agent
Timeline: Weeks 2-3 (starts after Phase 1)
Status: Open

Task Dependencies Flow

Phase 1 → ML Kit Integration → Camera UI ↘
                                         → OCRScanCubit → OCR Review Screen

Tasks

1. sheet-scanner-9xw - ML Kit Integration for Text Recognition

  • Status: TODO
  • Effort: 2-3 hours
  • Dependencies: Phase 1
  • Deliverables: ML Kit setup, text recognition, image processing, OCR result parsing

2. sheet-scanner-ri1 - Camera Capture UI & Viewfinder

  • Status: TODO
  • Effort: 2-3 hours
  • Dependencies: Phase 1, 9xw
  • Deliverables: Camera widget, live preview, capture button, permissions, mobile layout

3. sheet-scanner-bsb - OCRScanCubit State Management

  • Status: TODO
  • Effort: 2-3 hours
  • Dependencies: Phase 1, 9xw, ri1
  • Deliverables: Cubit with states (initial, processing, success, error)

4. sheet-scanner-qaq - OCR Review/Edit Screen

  • Status: TODO
  • Effort: 3-4 hours
  • Dependencies: Phase 1, all Phase 2 tasks
  • Deliverables: OCR results display, edit form, confidence badges, save/cancel actions

Phase 3: Desktop Workflow

Owner: Desktop/Frontend Agent
Timeline: Weeks 2-4 (parallel with Phase 2)
Status: Open

Phase 3 Core Tasks

1. sheet-scanner-3je - File Picker & Drag-Drop Upload

  • Status: TODO
  • Effort: 2-3 hours
  • Dependencies: Phase 1
  • Deliverables: Native file picker, drag-drop zone, file validation, multiple selection

2. sheet-scanner-fc3 - Desktop-Specific Layouts & Navigation

  • Status: TODO
  • Effort: 2-3 hours
  • Dependencies: Phase 1, hpe
  • Deliverables: Desktop sidebar, multi-column layouts, keyboard shortcuts, context menus

Shared UI Screens (from Desktop Agent)

3. sheet-scanner-c19 - Home/Dashboard Screen

  • Status: TODO
  • Effort: 2-3 hours
  • Deliverables: Stats display, recent activity, quick actions, adaptive layout

4. sheet-scanner-my0 - Browse/Inventory List Screen (MVP)

  • Status: TODO
  • Effort: 3-4 hours
  • Deliverables: Sheet list/grid, lazy loading, empty states, item actions

5. sheet-scanner-0fi - Search/Browse UI with Filters

  • Status: TODO
  • Effort: 3-4 hours
  • Deliverables: Search bar, filter UI, sort options, live results

6. sheet-scanner-pcl - Sheet Detail View Modal

  • Status: TODO
  • Effort: 2-3 hours
  • Deliverables: Full metadata, image gallery, edit/delete actions, tag display

7. sheet-scanner-3nc - Settings/Configuration Screen

  • Status: TODO
  • Effort: 2-3 hours
  • Deliverables: App preferences, theme toggle, backup link, app info

Phase 4: Search & Filtering

Owner: Search/Data Agent
Timeline: Weeks 2-3 (parallel with Phase 2 & 3)
Status: Open

Task Dependencies Flow

Phase 1 → FTS5 Search → SearchCubit ↘
      → Tag Management ─────────────→ Advanced Search UI

Tasks

1. sheet-scanner-eg7 - FTS5 Full-Text Search Integration

  • Status: TODO
  • Effort: 2-3 hours
  • Dependencies: Phase 1
  • Deliverables: FTS5 table setup, indexing logic, query functions, ranking

2. sheet-scanner-3ct - Tag Management System

  • Status: TODO
  • Effort: 2-3 hours
  • Dependencies: Phase 1
  • Deliverables: Tag CRUD, suggestions, auto-complete, merging, cascade deletion

3. sheet-scanner-2tm - SearchCubit State Management

  • Status: TODO
  • Effort: 2-3 hours
  • Dependencies: Phase 1, eg7
  • Deliverables: Cubit with debounced search, filter state, sort options

4. sheet-scanner-1qd - Advanced Search/Filter Modal

  • Status: TODO
  • Effort: 2-3 hours
  • Dependencies: Phase 1, 2tm
  • Deliverables: Complex filter UI, date range picker, multi-select tags, preset filters

Phase 5: Backup & Polish

Owner: Backup/Polish Agent
Timeline: Weeks 3-4 (depends on all phases)
Status: Open

Task Dependencies Flow

Phase 1 → Export → Import
      → Backup UI
      → Bulk Operations (with Phase 3 UI)
      → Edit Sheet (with Phase 3 detail view)

Tasks

1. sheet-scanner-8py - Export Functionality (JSON/ZIP/Database)

  • Status: TODO
  • Effort: 3-4 hours
  • Dependencies: Phase 1
  • Deliverables: JSON export, ZIP export with images, SQLite export, scheduling

2. sheet-scanner-dty - Import Functionality (Merge/Replace Modes)

  • Status: TODO
  • Effort: 2-3 hours
  • Dependencies: Phase 1, 8py
  • Deliverables: Import from JSON/ZIP/DB, merge/replace modes, duplicate detection, rollback

3. sheet-scanner-6o2 - Backup/Export UI Screen

  • Status: TODO
  • Effort: 2-3 hours
  • Dependencies: Phase 1, 8py
  • Deliverables: Format selector, file picker, progress indicator, success messages

4. sheet-scanner-pp1 - Bulk Operations (Desktop)

  • Status: TODO
  • Effort: 2-3 hours
  • Dependencies: Phase 1, Phase 3 browse UI
  • Deliverables: Multi-select, bulk delete, bulk tags, bulk export, action toolbar

5. sheet-scanner-7rz - Edit Existing Sheet Functionality

  • Status: TODO
  • Effort: 2-3 hours
  • Dependencies: Phase 1, Phase 3 detail view
  • Deliverables: Edit form, image management, tag updates, validation

Agent Hand-Off Protocol

Phase 1 → Phases 2-5

Core/Lead Agent delivers:

  • ✅ Complete project structure
  • ✅ Working database with migrations
  • ✅ DI setup in injection.dart
  • ✅ Repository interfaces
  • ✅ Image storage system
  • ✅ App shell with routing
  • ✅ Tests passing
  • ✅ No lint/format errors

Phase 2-5 agents:

  • Use DI to access services
  • Follow repository pattern
  • Use Either<Failure, Result> types
  • Keep features independent
  • Never import data/presentation from other features (domain only)

Integration Testing

Core/Lead Agent verifies:

  • All features integrate correctly
  • Cross-feature communication works
  • No broken dependencies
  • Final code review before merge

Success Metrics

Code Quality

  • 0 lint errors (warnings acceptable)
  • 70%+ test coverage
  • All tests passing
  • Clean architecture compliance verified

Feature Completeness

  • All tasks closed with working code
  • Manual testing on target platforms
  • UI responsive on mobile/tablet/desktop
  • Error handling for edge cases

Team Health

  • Clear communication via beads & agent mail
  • No blocked tasks lasting >2 hours
  • Daily progress updates
  • Weekly retrospectives

Coordination Tools

Beads Issue Tracking

bd create "Task title" -t task -p 1
bd update sheet-scanner-123 --status in_progress
bd close sheet-scanner-123 --reason "Completed"
bd ready --json
bd sync

Agent Mail

  • Coordination between agents
  • Design decisions & architecture questions
  • Status updates and blockers
  • Code review feedback

File Reservations

Reserve files before starting work:

mcp__mcp_agent_mail__file_reservation_paths(
  paths: ["lib/features/sheet_music/**"],
  exclusive: true,
  reason: "sheet-scanner-123: Implementing sheet_music feature"
)