You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
Fit the generated Software Garden into Cloud's 60-minute run cap (cloud#4235) #155
Cloud now caps every hosted Relayflow v2 run at 60 minutes (AgentWorkforce/cloud#4235: Daytona credits are exhausted, and E2B sandboxes have a verified one-hour lifetime). The generated Software Garden flow still plans for 180 minutes (FLOW_TIME.headerMinutes = 180, bodyMinutes = 175, in web/lib/flow-workflows.ts). Measured runs this week took 1.5–2 h, so on E2B most Garden runs are cut off mid-flow, and the time-aware step gating (#132) is working from a deadline that is 3x too long.
Where the time goes today: the full check suite runs 2–4 times per run (~12–15 min each on Rust repos, where kernel/target is rebuilt from scratch); up to two 45-min repair agents; a base-commit check that reruns the whole suite; plan + plan-review agents; two adversarial reviews; and a fix round.
Ask: fit a typical run into 30–45 min and the worst case into 60
Real deadline.FLOW_TIME.headerMinutes = 60 (Cloud's cap), with setupMinutes sized for E2B cold start. Re-derive every allowance and *StartMinutes from it, and keep the existing budget-sim sweep test (every step at its full limit still leaves publishing room).
Fewer check runs. Reuse the build cache between check runs (e.g. a shared CARGO_TARGET_DIR / dependency cache outside the worktree). Make the base-commit check optional: skip it when there is not time for a full check plus publishing, and report "base not checked".
One repair round, with an agent timeout of about 15 min (relayflows ≥2.0.40 f.agent({ timeout }), live in Cloud's runtime).
One adversarial review (20 min cap) and no separate fix round by default. Unresolved findings go on the draft PR, as they do today.
Drop the separate plan-review agent. The implementer's task includes planning, so the traditional workflow becomes discover → implement → check → (repair) → publish → review.
Fail fast to a draft PR: when the remaining time can't fit the next long step, publish what exists as a draft with the report, using the existing time-stop path.
Disk: clean build outputs and caches the run no longer needs before the second check (the E2B/Daytona sandbox is 10 GB, and a doubled Rust build fills it: flows#505, relay#1824).
Acceptance
Generator tests updated, plus a sweep test proving the worst case fits 60 min.
The generated flow passes flows check.
The orchestrator re-applies the change to the seven live Gardens and proves one real Garden run on E2B completes and opens a PR within 60 min.
Activity