Skip to content

fix(updater): require confirmation before installing downloaded updates #5996

fix(updater): require confirmation before installing downloaded updates

fix(updater): require confirmation before installing downloaded updates #5996

Triggered via pull request September 5, 2026 03:17
Status Cancelled
Total duration 12m 29s
Artifacts –

ci.yml

on: pull_request
Build Impact
19s
Build Impact
Shell Deploy Scripts
13s
Shell Deploy Scripts
Matrix: cli-test
Matrix: Impact-selected Linux / Relay Contract / build
Matrix: rust-build-check
DSH Profile Packaging (windows-latest)
50s
DSH Profile Packaging (windows-latest)
Frontend Build
1m 26s
Frontend Build
Rust / CLI Validation
5s
Rust / CLI Validation
Fit to window
Zoom out
Zoom in

Annotations

14 errors
Frontend Build
Process completed with exit code 1.
Rust Build Check (windows-latest)
Canceling since a higher priority waiting request for ci-refs/pull/2803/merge exists
Rust Build Check (windows-latest)
The operation was canceled.
Rust Build Check (ubuntu-latest)
Canceling since a higher priority waiting request for ci-refs/pull/2803/merge exists
Rust Build Check (ubuntu-latest)
The operation was canceled.
Impact-selected Linux / Relay Contract / Linux Binaries (linux-x64)
Canceling since a higher priority waiting request for ci-refs/pull/2803/merge exists
Impact-selected Linux / Relay Contract / Linux Binaries (linux-x64)
The operation was canceled.
Impact-selected Linux / Relay Contract / Linux Binaries (linux-arm64)
Canceling since a higher priority waiting request for ci-refs/pull/2803/merge exists
Impact-selected Linux / Relay Contract / Linux Binaries (linux-arm64)
The operation was canceled.
Rust Build Check (macos-15)
Canceling since a higher priority waiting request for ci-refs/pull/2803/merge exists
Rust Build Check (macos-15)
The operation was canceled.
CI
Canceling since a higher priority waiting request for ci-refs/pull/2803/merge exists
CI
Canceling since a higher priority waiting request for ci-refs/pull/2803/merge exists
Rust / CLI Validation
Process completed with exit code 1.