Skip to content

Load Shedding/Generation Re-dispatch to adjust/optimize for N-1 violation #3

Description

@jinjingfarm

Sensitivity Analysis: For the P1 failures, indicate how much "Load Shed" or "Generation Re-dispatch" would be required to bring the system back into limits. TPL-001-5 strictly limits the use of Non-Consequential Load Shedding for P1 events.

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

Labels

enhancementNew feature or request

Projects

No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions