TGW (Telematics / Central Gateway) software routing design based on AUTOSAR Classic Platform R21-11, meeting ISO 26262 functional safety (highest allocated ASIL-D via ASIL-B(D) decomposition + end-to-end protection).
docs/TGW_Routing_Design.md— architecture and safety conceptdocs/TGW_Code_Design.md— detailed code design (module map, control flow)docs/TGW_IDPS_Design.md— cybersecurity / IDPS design (ISO 21434, UN R155)config/PduR_RoutingTable.arxml— PduR routing table excerptsrc/PduR/— routing dispatchersrc/Safety/— SafetyMgr, SecOC gate, deadline monitor, E2E wrappersrc/Security/— IdsM, anomaly detector, IdsR off-board reportersrc/OS/— OS-Application partitioningtest/— host unit tests (cd test && make run)