Repository navigation
v0.5.61 — Lab Partner Onboarding Pack (Loop 40) - #157
Merged
Merged
Conversation
added 3 commits
July 6, 2026 16:04
Phase 4 begins with comprehensive CRO/academic lab partner onboarding. Changes: - docs/LAB_PARTNER_ONBOARDING.md -- Full onboarding pack: candidate panel (24 candidates, 15 families), synthesis instructions (SPPS, purity, modifications), assay protocols (MIC, hemolysis, serum stability), data return JSON format, controls, safety (BSL-2), timeline (5-8 weeks). - docs/50_LOOP_PLAN.md -- Loop 40 complete, Phase 4 in progress, next Loop 41. - docs/ROADMAP.md -- v0.5.61 entry. - docs/METRICS_CURRENT.md -- Changelog updated. No code changes. 1966 tests passing.
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Phase 4 begins with a comprehensive CRO onboarding document.
Primary:
docs/LAB_PARTNER_ONBOARDING.md— covers candidate panel (24 candidates, 15 families), synthesis instructions (SPPS, purity, Nle for Met, N-term acetylation), assay protocols (MIC, hemolysis, serum stability), data return JSON format, positive/negative controls, safety (BSL-2), timeline (5-8 weeks).Doc updates: 50_LOOP_PLAN (Loop 40 complete, Phase 4 in progress, next Loop 41). ROADMAP (v0.5.61). METRICS_CURRENT (changelog). SIMULATION_BENCHMARK.md phrasing fix.
No code changes. 1966 tests passing (pre-push full suite).