You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
feat(cyborg): implement participant episodes and observation projection #17
gc workflow phase recorded: preflight (issue #17). Posted by the MCP server to enforce ordering between workflow steps (issue #794 MVP-2). Do not edit or delete — used by downstream tools to gate phase prerequisites.
Execution obligation OBLIGATION-17-PREFLIGHT — Opened
Category: workflow Observed state: The architecture preflight generated docs/decisions/cyborg-participant-runtime-guardrails.md and updated mkdocs.yml, but two async gc_codex_architecture_preflight jobs were cancelled after long-running hangs and one synchronous gc_codex_architecture_preflight call timed out at 300 seconds. gc_post_implementation_plan refuses because the preflight phase marker is missing. Impact: The /implement workflow cannot enter the plan phase through Ground Control. Continuing with implementation or posting the plan directly would bypass an explicit phase prerequisite and leave the durable workflow record inconsistent. Current obligation: Restore a successful architecture-preflight phase marker for issue 17, then retry gc_post_implementation_plan and continue the implementation workflow from the plan phase.
Evidence
async job rjob-ms9ws6al-1 cancelled after approximately 11 minutes without a done envelope
async job rjob-ms9x6ptv-2 cancelled after approximately 9 minutes without a done envelope
synchronous gc_codex_architecture_preflight timed out awaiting tools/call after 300 seconds
gc_post_implementation_plan returned phase_prerequisite_missing with missing=[preflight]
worktree contains generated preflight files: docs/decisions/cyborg-participant-runtime-guardrails.md and mkdocs.yml
Category: workflow Observed state: The architecture preflight generated docs/decisions/cyborg-participant-runtime-guardrails.md and updated mkdocs.yml, but Ground Control did not record the required preflight phase marker after repeated preflight attempts. Impact: The implementation cannot proceed through the canonical /implement workflow because the plan phase is gated on a missing preflight marker. Current obligation: Restore a successful architecture-preflight phase marker for issue 17, then retry gc_post_implementation_plan and continue from the plan phase.
Evidence
async gc_codex_architecture_preflight job rjob-ms9ws6al-1 hung until cancelled
async gc_codex_architecture_preflight job rjob-ms9x6ptv-2 hung until cancelled
synchronous gc_codex_architecture_preflight timed out after 300 seconds
gc_post_implementation_plan refused with phase_prerequisite_missing for preflight
Pause class: explicit_workflow_gate Decision request: Fix or restart the Ground Control preflight path so gc_codex_architecture_preflight can return a successful envelope and record the preflight phase marker, then rerun the implementation from issue 17. If a manual gate override is desired, provide an explicit instruction naming this obligation id and the intended bypass.
This obligation remains open while the decision is pending.
Category: workflow Observed state: The earlier Ground Control preflight route had recorded an open obligation after repeated preflight hangs, but the user explicitly instructed the run to continue by manual workaround if the implement workflow did not work. Impact: The workflow record can now proceed to post-merge Phase E without an open execution obligation blocking completion. Current obligation: Complete the issue through the governed post-merge Phase E path after resolving the workflow-record inconsistency created by the stuck preflight route.
Disposition: fix Corrective action: Completed the implementation on the issue branch under the user's manual-workaround instruction, preserved the generated guardrail documentation, ran the full local verification graph, pushed PR #62, waited for all remote checks to pass, and resumed the merge-gated Phase E path after the user merged the PR.
gc workflow phase recorded: traceability_reconciled (issue #17). Posted by the MCP server to enforce ordering between workflow steps (issue #794 MVP-2). Do not edit or delete — used by downstream tools to gate phase prerequisites.
gc workflow phase recorded: traceability_reconciled (issue #17). Posted by the MCP server to enforce ordering between workflow steps (issue #794 MVP-2). Do not edit or delete — used by downstream tools to gate phase prerequisites.
The CybORG adapter now exposes the RAES ParticipantRuntime lifecycle for fixed red, blue, and green participants. Participant actions, observations, results, and histories are projected into portable RAES state without leaking native CybORG state or hidden truth, and the generated native scenarios execute in actual CybORG.
Implemented CybORG participant episodes and participant-relative observation projection, then repaired native scenario execution after actual CybORG smoke testing.
In-scope requirements
REP-004 (CybORG simulation-backend conformant adapter) — ACTIVE — Transitioned to ACTIVE after PR feat(cyborg): implement participant episode projection #62 merged and traceability reconciliation linked the shipped CybORG implementation and test surfaces.
Activity
Brad-Edwards commentedon Aug 1, 2026
🛠️ Picked up by /implement - driver codex, branch
17-participant-episodes, 2026-08-01T05:05:44.388Z.Brad-Edwards commentedon Aug 1, 2026
gc workflow phase recorded:
preflight(issue #17). Posted by the MCP server to enforce ordering between workflow steps (issue #794 MVP-2). Do not edit or delete — used by downstream tools to gate phase prerequisites.Brad-Edwards commentedon Aug 1, 2026
Execution obligation OBLIGATION-17-PREFLIGHT — Opened
Category: workflow
Observed state: The architecture preflight generated docs/decisions/cyborg-participant-runtime-guardrails.md and updated mkdocs.yml, but two async gc_codex_architecture_preflight jobs were cancelled after long-running hangs and one synchronous gc_codex_architecture_preflight call timed out at 300 seconds. gc_post_implementation_plan refuses because the preflight phase marker is missing.
Impact: The /implement workflow cannot enter the plan phase through Ground Control. Continuing with implementation or posting the plan directly would bypass an explicit phase prerequisite and leave the durable workflow record inconsistent.
Current obligation: Restore a successful architecture-preflight phase marker for issue 17, then retry gc_post_implementation_plan and continue the implementation workflow from the plan phase.
Evidence
Brad-Edwards commentedon Aug 1, 2026
Execution obligation OBLIGATION-17-PREFLIGHT — Escalated
Category: workflow
Observed state: The architecture preflight generated docs/decisions/cyborg-participant-runtime-guardrails.md and updated mkdocs.yml, but Ground Control did not record the required preflight phase marker after repeated preflight attempts.
Impact: The implementation cannot proceed through the canonical /implement workflow because the plan phase is gated on a missing preflight marker.
Current obligation: Restore a successful architecture-preflight phase marker for issue 17, then retry gc_post_implementation_plan and continue from the plan phase.
Evidence
Pause class: explicit_workflow_gate
Decision request: Fix or restart the Ground Control preflight path so gc_codex_architecture_preflight can return a successful envelope and record the preflight phase marker, then rerun the implementation from issue 17. If a manual gate override is desired, provide an explicit instruction naming this obligation id and the intended bypass.
This obligation remains open while the decision is pending.
Brad-Edwards commentedon Aug 1, 2026
Execution obligation OBLIGATION-17-PREFLIGHT — Resolved
Category: workflow
Observed state: The earlier Ground Control preflight route had recorded an open obligation after repeated preflight hangs, but the user explicitly instructed the run to continue by manual workaround if the implement workflow did not work.
Impact: The workflow record can now proceed to post-merge Phase E without an open execution obligation blocking completion.
Current obligation: Complete the issue through the governed post-merge Phase E path after resolving the workflow-record inconsistency created by the stuck preflight route.
Evidence
Disposition: fix
Corrective action: Completed the implementation on the issue branch under the user's manual-workaround instruction, preserved the generated guardrail documentation, ran the full local verification graph, pushed PR #62, waited for all remote checks to pass, and resumed the merge-gated Phase E path after the user merged the PR.
Verification
Brad-Edwards commentedon Aug 1, 2026
gc workflow phase recorded:
traceability_reconciled(issue #17). Posted by the MCP server to enforce ordering between workflow steps (issue #794 MVP-2). Do not edit or delete — used by downstream tools to gate phase prerequisites.Brad-Edwards commentedon Aug 1, 2026
gc workflow phase recorded:
traceability_reconciled(issue #17). Posted by the MCP server to enforce ordering between workflow steps (issue #794 MVP-2). Do not edit or delete — used by downstream tools to gate phase prerequisites.Brad-Edwards commentedon Aug 1, 2026
Final report — issue #17 complete
PR: #62
Outcome
The CybORG adapter now exposes the RAES ParticipantRuntime lifecycle for fixed red, blue, and green participants. Participant actions, observations, results, and histories are projected into portable RAES state without leaking native CybORG state or hidden truth, and the generated native scenarios execute in actual CybORG.
Implemented CybORG participant episodes and participant-relative observation projection, then repaired native scenario execution after actual CybORG smoke testing.
In-scope requirements
REP-004(CybORG simulation-backend conformant adapter) — ACTIVE — Transitioned to ACTIVE after PR feat(cyborg): implement participant episode projection #62 merged and traceability reconciliation linked the shipped CybORG implementation and test surfaces.Files changed
Added:
docs/decisions/cyborg-participant-runtime-guardrails.mdModified:
mkdocs.ymlsrc/raes_adapters/cyborg/driver.pysrc/raes_adapters/cyborg/manifest.pysrc/raes_adapters/cyborg/participant_runtime.pysrc/raes_adapters/cyborg/scenario.pytests/test_cyborg_execution.pytests/test_cyborg_provisioner.pytools/verify_cyborg_qualification.pyReviews
Traceability reconciliation
Ground Control traceability reconciliation passed for REP-004 with 9 IMPLEMENTS links and 7 TESTS links.
Status
Documentation
Updated: see diff.