Skip to content

Install the Ground Control Phase E workflow #1380

Description

@Brad-Edwards

Summary

Readiness for #1352 and PR #1378 required .github/workflows/ground-control-phase-e.yml on dev. Merged PR #1379 installed the guarded workflow; PR #1381 was closed as superseded.

This is the bounded workflow-install portion of #1377; the package migration and doctor acceptance criteria remain on that issue.

Acceptance criteria

  • Install the Phase E workflow for exact grndctl@1.2.1 with pinned action commits. Keep workflow-level permissions read-only and grant issues: write only to the guarded finalization job.
  • Trigger only after merged pull requests to main or dev, or an explicit maintainer repair dispatch.
  • Preserve immutable merged-revision reads and read-only checkout credentials; limit write permission to issues.
  • Parse and inspect the workflow, run targeted repository policy checks and pre-commit, and pass hosted checks.
  • Document the bootstrap dependency and its resolution: readiness required this workflow on dev, and merged PR docs: define external inject semantics and install delivery finalization #1379 supplied it.

Requirements

None. Repository workflow setup only; no product requirement or semantic contract change.

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions