Skip to content

docs: update HANDOFF for PRs #3-#5 and VaultPanel+ v1 bridge surface - #10

Merged
Z3r0DayZion-install merged 1 commit into
mainfrom
codex/next-16-ast-node-integration-gate
May 12, 2026
Merged

Z3r0DayZion-install merged 1 commit into
mainfrom
codex/next-16-ast-node-integration-gate

Conversation

@Z3r0DayZion-install

Copy link
Copy Markdown
Owner

Summary

Test plan

  • Verify HANDOFF.md renders correctly on GitHub
  • Confirm all PR numbers and merge commits are accurate

🤖 Generated with Claude Code

- NeuralOS_Master_Build PRs #3 (nodeIntegration gate), #4 (timing cleanup),
  #5 (VaultPanel+ v1) all noted as merged
- VaultPanel+ corrected to React 19 (not Svelte); added to component tree
- Added VaultPanel+ bridge API surface table for onboarding context
- Removed stale waitForTimeout(120) flakiness note (fixed in PR #4)
- Issue #9 section header: "in review" → "merged"
- Recent branches split into NeuralOS_Master_Build / ForgeCore_OS tables
- Added vaultpanel-plus build command to key commands

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
@Z3r0DayZion-install
Z3r0DayZion-install merged commit da17279 into main May 12, 2026
6 checks passed
@Z3r0DayZion-install
Z3r0DayZion-install deleted the codex/next-16-ast-node-integration-gate branch May 12, 2026 21:12
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant