Repository navigation
Conversation
|
@Cjay-Cyber-2 is attempting to deploy a commit to the ACCENSA Team on Vercel. A member of the Team first needs to authorize it. |
|
@ndyugwu Great news! 🎉 Based on an automated assessment of this PR, the linked Wave issue(s) no longer count against your application limits. You can now already apply to more issues while waiting for a review of this PR. Keep up the great work! 🚀 |
|
MergeKeeper review Scope: in scope for linked issue This PR correctly updates the four remaining workflows (publish.yml, reconcile.yml, visual-test.yml) to use pnpm/action-setup@v4 with the pinned version 11.28.5 before actions/setup-node, adds pnpm caching, and introduces necessary timeout-minutes bounds for all affected jobs in accordance with issue #572. Reviewed commit: |
|
No actionable comments were generated in the recent review. 🎉 ℹ️ Recent review info
📝 Walkthrough
Merge Risk: ⚪ Minimal · up to
|
There was a problem hiding this comment.
Approved
This PR correctly updates the four remaining workflows (publish.yml, reconcile.yml, visual-test.yml) to use pnpm/action-setup@v4 with the pinned version 11.28.5 before actions/setup-node, adds pnpm caching, and introduces necessary timeout-minutes bounds for all affected jobs in accordance with issue #572.
|
MergeKeeper merge status Status: blocked Reason: Next steps:
|
Update all five pnpm-installing jobs in
publish.yml,reconcile.yml, andvisual-test.ymlto use the existingci.ymlpattern: pnpm/action-setup@v4 with pnpm 11.28.5 before setup-node, plus pnpm caching. Add job timeouts: publish build/test 20m, tarball verification 15m, publish 10m, reconciliation 10m; the existing visual job remains 20m. Recent reconciliation runs were 38–57 seconds and visual runs about 90–113 seconds. No tagged publish workflow runs were available to measure, so the release job caps are conservative bounds; the three workflows have triggers that do not run on pull requests, so branch-run links cannot be produced without changing out-of-scope trigger lines.Checks: targeted Prettier check and git diff --check passed. The full CI workflow runs on this PR.
Closes #572
Summary by CodeRabbit