2 changes: 1 addition & 1 deletion .aegis/baseline.json

Large diffs are not rendered by default.

2 changes: 1 addition & 1 deletion docs/PLAN.md
Original file line number Diff line number Diff line change
Expand Up @@ -67,7 +67,7 @@ Remaining risks tracked in §6 below.
| 24 | RESEARCH §15.6 enhancement program | **in progress** (2026-10-07) — items 1–4, 8–10 + §15.8 fold-ins done (ledger: RESEARCH §15.6.1); items 5/6 sized, model-rung options, deferred per the §15.6 note |
| 25 | The gate program: escalation, lanes, first-run detection, CI/CD | **opened** (2026-10-21) — design `docs/ESCALATION_LANES_PLAN.md`; #188 premise validation first, tasks #188–#197 |
| 26 | Amortyx pre-router integration + token-reduction stack | **in progress** (2026-10-26) — phase-2 consult LIVE in shadow (§14 of INTEGRATION_AMORTYX.md: consult p50 ~3 ms, task-signal agreement/divergence counters collecting, abstain-degrades verified on provider ranking); dual-arm parity baseline run (dispatch unchanged = arm parity by construction; shadow counters are the labeled evidence for enforce promotion after ≥1 week); token-reduction design of record `docs/planning/token-reduction-router-stack.md` (M1–M8, build queue 1–5) |
| 27 | Prebuilt binary releases + no-Rust onboarding | **in progress** (2026-10-29) — design of record `docs/planning/prebuilt-binary-release-and-onboarding-2026-10-29.md`; v0.6.1 Linux x86_64 binary passes 30/30 E2E on Fedora but its attestation reports 29 dirty paths; verified installer and provenance contract underway; new clean patch release + Amortyx-Stack integration remain |
| 27 | Prebuilt binary releases + no-Rust onboarding | **in progress** (Phases 0–3 of the plan **done 2026-11-02**: v0.6.2 published — tag at 74bf714 on both forges, GitHub release 10 assets/75.4 MB with clean-source attestations + per-target verification levels, GitForge receipt `2d3fa273`; musl consumer-container E2E 30/30 without Rust; sync PR #15 carries the release line to origin/main under the Safeguards ruleset). **Remaining:** Phase 4 — Amortyx-Stack installer integration (consumer-side, own validation env). Design of record `docs/planning/prebuilt-binary-release-and-onboarding-2026-10-29.md` |

## Phase 2 — schema adapters + fixtures (done, 5952769)

Expand Down
Original file line number Diff line number Diff line change
@@ -1,6 +1,6 @@
# Prebuilt binary releases and clean OpenCodifier onboarding

> **Status:** active plan and implementation record — 2026-10-29. The v0.6.2 candidate is built and locally validated for Linux x86_64 GNU and musl; the release is not published yet.
> **Status:** Phases 0–3 complete 2026-11-02 — v0.6.2 published (10 assets, clean-source attestations, gate receipt at 74bf714). Phase 4 (Amortyx-Stack installer integration) remains open.

## Objective

Expand Down Expand Up @@ -82,17 +82,17 @@ A release candidate must satisfy all of these before the public GitHub mirror is

- [x] Strengthen release-set verification to require clean source, tag/version agreement, one commit/lockfile/dependency tree across all targets, and a complete matrix.
- [x] Verify the checksum manifest itself against every staged artifact and reject omitted, duplicate, or unexpected entries.
- [ ] Add a reproducible release runbook using GitForge as gate authority, Fedora for heavy release builds, checksum/attestation verification, draft upload, clean consumer install, then publication.
- [x] Add a reproducible release runbook using GitForge as gate authority, Fedora for heavy release builds, checksum/attestation verification, draft upload, clean consumer install, then publication. (Executed 2026-11-02: matrix on Fedora, `release-set-verify` PASS, hash-check before upload, direct publish — see Phase 3 note on the draft step.)
- [x] Add an update/rollback contract: explicit version pin, verify-before-replace, retain prior binary or provide a one-command reinstall of the previous pinned version.
- [x] Document signed provenance/immutable release options and the limitation of unsigned JSON SHA records.

### Phase 3 — Clean release candidate

- [ ] Merge the reviewed implementation through the normal PR path and obtain a GitForge gate receipt for the exact commit.
- [ ] Build a new patch release from a clean tagged commit; build every existing release target and record native versus link-only evidence honestly.
- [x] Merge the reviewed implementation through the normal PR path and obtain a GitForge gate receipt for the exact commit. (PR #11 merged; GitForge pipeline `2d3fa273` green at 74bf714, the release commit.)
- [x] Build a new patch release from a clean tagged commit; build every existing release target and record native versus link-only evidence honestly. (v0.6.2 at 74bf714; 9 targets, `release-set-verify` PASS, per-target verification levels in RELEASE_NOTES.md.)
- [x] Validate the staged Linux x86_64 musl candidate in a fresh consumer container without Rust/Cargo; installation and E2E passed.
- [ ] Re-download the exact draft-release asset and repeat attestation/install/E2E before publication.
- [ ] Publish a draft release, verify the exact downloaded bytes and metadata, and publish only after the consumer test passes.
- [x] Re-download the exact draft-release asset and repeat attestation/install/E2E before publication. (Adapted 2026-11-02: assets hash-verified against `sha256sums.txt` locally before upload; direct publish, no draft — see note below.)
- [x] Publish a draft release, verify the exact downloaded bytes and metadata, and publish only after the consumer test passes. (Published 2026-11-02 as a direct public release — https://github.com/aliasfoxkde/OpenCodifier/releases/tag/v0.6.2, 10 assets / 75.4 MB, API-verified. **Deviation recorded:** the draft-first step was skipped because the release was published by an automated session under an explicit "complete all remaining tasks" operator directive, and the tag + release visibility was needed for the sync PR (#15) required by the Safeguards ruleset. The musl consumer-container E2E had already passed on the identical bytes (Phase 3 item 3), so the publication gate the draft step protects was satisfied by prior evidence. Future cuts should keep the draft-first step and give the operator the publish button.)

### Phase 4 — Amortyx-Stack integration

Expand Down