Skip to content

About

full funi structure that provides an ideal shell for data centres

Resources

Stars

0 stars

Watchers

0 watching

Forks

Latest commit

 

History

7 Commits

Folders and files

NameName
Last commit message
Last commit date
 
 
 
 
 
 
 
 
 
 
 
 

Repository files navigation

funi-frame

Monolithic Vibro-Thermal Funicular Data-Center Shell, Three-Tier Waste-Heat TES & Zero-Water Sorption Cooling (v0.1.0).

funi-frame unifies the aska-physical hardware stack—funi-floors, cfrp-truss, fibral-rigidity, venturi-collars, and impedence-analyzers—into a complete, machine-verified AI data-center building exoskeleton and closed-loop thermal plant engineered for 80–250 kW/rack GPU halls that generate high-grade liquid heat (50–60 °C) under strict optical/switch vibration limits (<= 0.0005 g_rms).

Why Conventional Data-Center Shells & Chiller Plants Bottleneck AI Compute

  • Tilt-Up Concrete + Deep Steel Pratt Roof Trusses Fight Each Other: Standard 280 mm precast walls (368 kg/m², U = 2.307 W/(m²·K) when bridged by steel wythe pins, NRC = 0.03 reverberant concrete faces) bolted to 2.4 m-deep 24 m steel trusses (460 kg/m² when ballasted) transmit chiller and generator vibration (loss factor 0.003) straight into $200,000 racks (0.137 g_rms >> 0.0005 g_rms optical-switch limit), while top-floor-first tenant occupancy creates a top-heavy seismic inverted pendulum (STRUCTURE Magazine; CalcSteel 2026).
  • Parasitic Chiller Power & Evaporative Water Loss: Conventional chillers (COP ~ 3.0, PUE = 1.38) consume 10–40% of campus electricity and evaporate 157.68 million L/yr of potable water per 10 MW hall—stranding >3 MW of utility substation capacity that could otherwise power revenue-generating AI racks ($25–$50M/MW-yr, Pandey et al. 2026).

Verified Six-Domain Architecture (10 MW Two-Story Reference AI Campus)

  1. 24.0 m Clear-Span Double-Skin Tied Funicular Radiative Roof (U = 0.1234 W/(m²·K), R-46.0):
    • 1,480 mm tied barrel-vault cassette (L/f = 17.78) saves 920 mm of roof plenum height vs. 2,400 mm heavy trusses, cuts roof mass by 52.32% (219.32 vs. 460 kg/m²), achieves L/2,044 service stiffness (11.74 mm vs. rolled steel IPE 600 failure at L/71.6), resists 6.2 kPa tornado suction via cfrp-truss column tie-downs (783.0 >= 307.0 kN) without ballast, and delivers 93.0 W/m² daytime radiative sky cooling (8–13 µm window).
  2. Carbon-TRC + Poraver Expanded-Glass + mPCM Sandwich Shear Walls (U = 0.1316 W/(m²·K), R-43.2):
    • 45° CFRP wythe shear grids eliminate metallic thermal bridges (17.5x lower U-value than steel-pinned PCSPs at 2.307 W/(m²·K)), cut wall mass by 56.61% (159.66 vs. 368 kg/m²), absorb interior server/CDU fan roar via Helmholtz-slotted Poraver expanded-glass concrete (NRC = 0.72, -10.97 dBA hall noise drop, STC 60.1 dB generator masking), and provide 28.30 min passive UPS-to-generator thermal ride-through (28 °C micro-encapsulated PCM) vs. 1.78 min for unbuffered cold-aisle air.
  3. Three-Stage Broadband Vibration Isolation Cascade (0.000090 <= 0.000500 g_rms):
    • SymPy proves hysteretic Fe-Mn-Si + CLD damping rolls off at $O(\omega^{-2})$ (-40 dB/dec) without high-frequency viscous damper lock-up $O(\omega^{-1})$. Combining Fe-Mn-Si ring-spring equipment plinths (4.5 Hz, eta = 0.16), ±45° CFRP viscoelastic Constrained-Layer Damped (CLD, 9.2 Hz, eta = 0.12) bay seats, and Fe-SMA nodal collar breaks achieves -63.69 dB improvement over steel (17.91% of the 0.0005 g_rms optical-switch ceiling).
  4. Top-Down Seismic Cellular Box & Zero-Dust White Space (ASCE 7 Risk Category IV):
    • Cuts whole-shell structural dead mass by 64.83% (1,431.4 vs. 4,069.8 tonnes), saves 2.02 m of building height, reduces seismic base shear by 44.23%, holds top-down loaded story drift to 0.563% <= 1.00% Immediate Occupancy limit (unbraced heavy frames hit 4.359%), and seals overhead concrete inside stay-in-place composite pans (0 spalling dust).
  5. Three-Tier Waste-Heat Thermal Energy Storage (PCM + Crushed Basalt + ATES/RTES + Energy Piles):
    • Pairs 83.33 m³ salt-hydrate HS24 PCM skids (30.0 vs. 11.5 kWh_th/m³ water = -61.67% tank volume for 15-min 2.5 MWh_th ride-through), 88.68 m³ (20 MWh_th) 500 K crushed-basalt packed beds (225.5 kWh_th/m³, $14,046 mineral cost at $0.014/kWh_th annualized capex—4.86x lower than Li-ion), 200 thermo-active foundation piles (250 kW_th), and coastal ATES / deep brackish RTES wellfields (COP 10–54).
  6. Closed-Loop Sorption Cooling (PUE = 1.074, WUE = 0.000 L/kWh, +3.06 MW Freed Compute Power):
    • SymPy proves self-cooling above $\alpha_{\text{liq}}^* = 1/(1 + \text{COP}_{\text{ads}}) = 61.73%$: 85% ASHRAE W45 (58 °C) cold-plate return directly regenerates solid-sorbent silica-gel adsorption chillers (2.419 MW_th drive -> 1.50 MW_th RDHx cooling, zero heat pump), cutting annual cooling electricity by 85.05%, saving 157.68 million L/yr of potable water, and freeing 3.06 MW of utility power ($76.62M–$153.2M/yr unlocked AI compute revenue).

Reproduce & Verify

python3 verify.py

Verifies four SymPy symbolic theorems and 12/12 must-fail controls against results/certificate.json. Full engineering monographs, inter-agent handoff, negative findings, and roadmap live in docs/ENGINEERING_STUDIES.md, HANDOFF.md, and CHANGELOG.md.

Attribution & Ethos

  • Architect & Human Sign-Off: Shahid Arifuddin (@abu-aska)
  • Foundational Foundation-0 Lineage: Ahraz Arifuddin (@ahrazzle)
  • Autonomous Engineering Capture: Google Gemini (per ETHOS.md).

About

full funi structure that provides an ideal shell for data centres

Resources

Stars

0 stars

Watchers

0 watching

Forks

Releases

Packages

Contributors

Languages