You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Follow-up discovery issue created 2026-09-22 from M0-D20 #77. It captures organization-specific facts that the product-default decision deliberately did not invent. It produces a recorded fact set, not product code.
Context
M0-D20 deferred all connectors on 2026-09-22. T2-08 stays a P2 hypothesis until measured manual effort shows which integrations save meaningful work.
Questions to answer
During the first readiness engagement, record manual inventory, population, access, and evidence effort by source.
Answer the ten integration questions in the M0-D20 decision for each candidate source.
Rank connectors by measured savings and recommend whether T2-08 is scheduled.
Involve
Compliance lead, engineering.
Done when
The facts, source, owner, and date are recorded in this issue.
Each linked story's requirements and acceptance criteria reflect the facts, or the point is explicitly excluded.
Any remaining uncertainty is captured as a further follow-up rather than left implicit.
Note
Follow-up discovery issue created 2026-09-22 from M0-D20 #77. It captures organization-specific facts that the product-default decision deliberately did not invent. It produces a recorded fact set, not product code.
Context
M0-D20 deferred all connectors on 2026-09-22. T2-08 stays a P2 hypothesis until measured manual effort shows which integrations save meaningful work.
Questions to answer
Involve
Compliance lead, engineering.
Done when
Source
M0-D20 #77 decision record.