Skip to content

fix(mesh): frame loss when recv_validated is cancelled mid-validation (#2458)#2745

Open
brocoppler wants to merge 1 commit into
block:mainfrom
brocoppler:fix/mesh-demo-loopback-flake
Open

fix(mesh): frame loss when recv_validated is cancelled mid-validation (#2458)#2745
brocoppler wants to merge 1 commit into
block:mainfrom
brocoppler:fix/mesh-demo-loopback-flake

fix(mesh): stop cancelling recv_validated mid-validation — frames wer…

4806ca4
Select commit
Loading
Failed to load commit list.
Block DCO Check / DCO Check succeeded Jul 24, 2026 in 0s

All PR commits have appropriate sign-off

All commits in this PR have the appropriate sign-off. No further action is required

Details

all commits have the required DCO sign-off.