Skip to content

bstack — substrate completion v0.4.0 → v1.0.0 (epic) #1336

Description

@broomva

Epic — bstack substrate completion arc

This epic tracks the 9-phase closure plan to take the bstack substrate from v0.3.1 to v1.0.0 stability. The canonical spec is specs/2026-05-18-substrate-completion.md (merged in broomva/bstack#31, commit 63d4896).

Phases

# Version Theme Status
0 docs only Architectural Contracts (this spec) ✅ Done (PR #31)
1 v0.4.0 Setpoint Measurement Pipeline Pending
2 v0.5.0 Status Surface Pending
3 v0.6.0 Schema Versioning + Migration Pending
4 v0.7.0 Companion Skill Auto-install Pending
5 v0.8.0 Doctor Extensions + Soft Gates Pending
6 v0.9.0 Vendored Upgrade + Canary Pending
7 v0.9.5 Crystallization Detection Pending
8 v0.10.0 Federation (optional) Pending
9 v1.0.0 Stability Pact Pending

Architectural contracts being closed

Plant, Controller, Setpoint, Gate, Primitive, Hook, Companion Skill, Release.

Each phase closes specific gaps from §4 of the canonical spec. Every phase is one PR, with concrete deliverables + tests + SLO targets + risks per §6 of the spec.

Cadence

≈ 1 release per 1-2 weeks. L3 stability budget (λ₃ ≈ 0.006) demands deliberate pacing.

Already shipped (backfilled tickets below)

  • v0.2.0 + v0.2.1 — retroactively tagged 2026-05-18
  • v0.2.2 — release infrastructure + CLI dispatcher (PR #27)
  • v0.2.3 — bstack repair merges hooks (PR #28)
  • v0.3.0 — SessionStart auto-upgrade hook (PR #29) — broomva/life#1329
  • v0.3.1 — auto-tag + GitHub Release on merge (PR #30)
  • Phase 0 spec (PR #31)

References

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions