frame gate: empty-period rotations and spectra half-turns are not frame mixing - #232

Merged
bvkay merged 1 commit into
mainfrom
fix/frame-gate-empty-periods
Sep 18, 2026
Merged

bvkay merged 1 commit into
mainfrom
fix/frame-gate-empty-periods

Conversation

@bvkay

@bvkay bvkay commented Sep 18, 2026

Copy link
Copy Markdown
Owner

Two export shapes were refused as per-period frame mixing and are not. EMpower writes a rotation of 0 at periods whose tipper or impedance is the EMPTY sentinel and the real angle (8 or 41 degrees) on every estimate; the gate now reads rotation angles only at periods that carry data. Bollards Lagoon BL02 and BL11 carry ROTSPEC=180 with HX written 360; negating both horizontal axes leaves every cross-power and so the impedance unchanged, and both stations agree with their 2 km neighbours to 2 to 4 degrees of phase, so a half-turn serves in the azimuth frame with the tipper sign noted. Local rebuild of the four affected packages: 260 stations built, only Renmark RM0111 and RM011B still refused (a real axis swap). Four new gate tests; policy header and build-lifecycle docs updated.

@bvkay
bvkay merged commit e208b15 into main Sep 18, 2026
13 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant