Skip to content

chore(agents): process review 2026-10-25: turbo, bug:new triage, feature auto-close, orchestrator scripts, tool-guard waiting rules - #993

Merged
V3RON merged 7 commits into
mainfrom
chore/audit-delivery-process
Oct 25, 2026
Merged

V3RON merged 7 commits into
mainfrom
chore/audit-delivery-process

Conversation

@V3RON

@V3RON V3RON commented Oct 25, 2026 •

Copy link
Copy Markdown
Contributor

Process review of every delivery and spec run since #904, with an adversary pass, and the decisions it led to.

  • docs/internal/PROCESS-REVIEW-2026-10-25.md and the rules-to-lints scout report with verdicts.
  • Turbo caches every build step: a warm pnpm run build with nothing changed goes from 15 s to 2 s.
  • bug:new is the triage queue (bug:triage is gone); the issue-state workflow closes a feature when its last sub-issue closes and closes its request in the same job.
  • The orchestrator's hand-built steps become scripts: issue-body.mjs, review-ledger.mjs, pr-shas.sh; ci-triage.mjs exits 3 on a stale run; merge-pr.sh prints progress.
  • The tool guard refuses, for a sub-agent, a test run without timeout, a background job, a loop that sleeps, a bare cat > file and the whole console lane; the slow lane is exempt.
  • The ADR status flip rides in the stack as one fix run before the gate.

After merge: relabel #981 and #264 to bug:new; delete the bug:triage and bug:triaged labels.

Review

Spec review: skipped. Code review: skipped. Claims review: skipped.
Rounds: 0. Tokens: n/a.
Maintainer-directed process change: merged on green CI by the maintainer's instruction, no review round.

Written by an agent.

V3RON added 6 commits October 25, 2026 09:19
…t changed

A warm pnpm run build with nothing changed took 15 s and every test:console or test:e2e
paid it; it is 2 s now, and one changed src/ file rebuilds the daemon alone (5 s).
…, the orchestrator's hand steps become scripts, and the tool guard breaks the polling chain

- delivery rules 1, 8, 9: an agent triages bug:new and stops; the issue-state workflow closes
  a feature when its last sub-issue closes and closes its request in the same job
- issue-body.mjs, review-ledger.mjs, pr-shas.sh; ci-triage.mjs exits 3 on a stale run and
  prints a failed job's log lines; merge-pr.sh prints a progress line per poll; the deliver
  skill names each where it replaces a hand-built step
- tool-guard.mjs refuses, for a sub-agent, a test run without timeout, a background job,
  a loop that sleeps, a bare cat > file, and the whole console lane; the slow lane is exempt
- the ADR status flip rides in the stack as one fix run before the gate
…ver-run rule, and its tests pass the timeout a test run needs
@V3RON
V3RON added this pull request to stack #998 October 25, 2026 09:53
@V3RON
V3RON merged commit 94dc890 into main Oct 25, 2026
45 of 47 checks passed
@V3RON
V3RON deleted the chore/audit-delivery-process branch October 25, 2026 10:29
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant