Skip to content

Close Atlas formal bridge G11 exercise gap - #768

Merged
d6g8k5htny-coder merged 3 commits into
mainfrom
codex/cbz-g11-atlas-formal-bridge-exercise-20261108
Nov 8, 2026
Merged

d6g8k5htny-coder merged 3 commits into
mainfrom
codex/cbz-g11-atlas-formal-bridge-exercise-20261108

Conversation

@d6g8k5htny-coder

@d6g8k5htny-coder d6g8k5htny-coder commented Nov 8, 2026 •

Copy link
Copy Markdown
Owner

Scope

Strictly stacked G11 maintenance follow-up targeting the Draft #767 branch, not Main. It changes one existing Atlas bridge test launcher, one repository-integration control, and the already component-specific G11 workflow command. It does not change the G11 auditor, mutation harness, production tool, mathematical statements, proof outcomes, default ref, Workspace pin, canonical federation/global surfaces, or scientific status.

Exact gap

The #767 exact-tree read-only residue inventory found one additional current execution contract that the census retained as unexercised: tests/test_atlas_formal_source_bridge.py actually launches tools/atlas_formal_source_bridge.py through subprocess.run, but builds a runtime-selected mode list and splats it into the command. The bounded static model therefore does not attribute that real launch.

RED and repair

A new repository-integration control failed on the unmodified #767 tree in normal and optimized modes with exactly one AssertionError: False is not true, zero errors and zero skips.

The repair builds child flags immutably and statically in command order. It preserves optimization levels 0, 1 and 2 as zero, one and two explicit -O tokens. The production bridge tool is unchanged.

Actual local verification

Local commit: 0e90fa2a73c8ae374e8e133da1bd46b12729bc16
Hosted commit: 396d3924c69566031afb3d17c64a0830f8d7e793
Shared exact tree: 2056468d4c900e3c8567ca265effefcc2db92ae4
Hosted parent / Draft #767 head: ad7c3cda514ed51ba1d3845ae1c613c41351120e

  • new integration control: 1/1 in normal, -O, and -OO;
  • real Atlas formal bridge suite: 20/20 in normal, -O, and -OO;
  • G11 census controls plus both repository-integration controls: 261/261 in normal, -O, and -OO;
  • exact-commit census in normal, -O, and -OO: byte-identical 56,361-byte JSON, SHA-256 7bdbefa7efee2d6bf79616b9ef14deab93d7b58507e5f9c99e926a0f48e7f95e;
  • every census intentionally exits 1 with zero production failures, zero skips, 93 tools, and 28 retained candidates, down from the stacked base's 29.

The G11 auditor and mutation inventory are unchanged; #767's current hosted mutation evidence is not rebound. This stacked head's hosted workflows are pending at PR creation.

Boundary

This closes one concrete static-exercise gap only. It does not establish G11 admission, Layer A clearance, the final mutation threshold, CBZ-0, or a terminal Partial Baseline. Draft #766 remains the earlier Main-targeting delivery; Draft #767 remains its serial successor. This PR must remain Draft and must not be retargeted to or integrated into Main until both predecessors are normally resolved.

Current stacked-base refresh (2026-11-08)

The final paragraph above records the original delivery state and is superseded for current source identity. Main #766 is merged, and #767's current-base branch head is 2723359f333d551f94796b10766ce335141684cb. #768 was advanced without force by merge commit a29a8642f734a9a967909024cf7f42b02ffaf089 (parents 396d3924c69566031afb3d17c64a0830f8d7e793 and 2723359f333d551f94796b10766ce335141684cb; tree dc88db5eca4385e5056df7d837b97d8499aace32).

Fresh exact-tree execution passed 265/265 G11 controls in normal, -O, and -OO, and the real Atlas bridge suite passed 20/20 in all three modes. The unchanged current G11 mutation source was freshly qualified on the composed predecessor at 328/328 kills in both required modes; the exact hosted a29a8642 census intentionally exits 1 with zero production findings and 28 retained tools. Current-base hosted checks are running and are not counted successful until their actual completion. #768 remains Draft and stacked behind #767 until #767 integrates normally; no CBZ-0, Layer A clearance, full-regression, mathematical, or scientific claim is made.

Main-targeting refresh after #767 integration

#767 merged normally as 849fe19049e40974674f3850be6fa195c1be5fd7 with tree 54ca7d287263fe03271be58cab72c6d41385bad9. #768 is now Ready and targets Main. Its exact head is d98916bbfd979d9ef08681a929088de54905bd56 (parents a29a8642f734a9a967909024cf7f42b02ffaf089 and 849fe19049e40974674f3850be6fa195c1be5fd7; unchanged qualified tree dc88db5eca4385e5056df7d837b97d8499aace32). The ref update was a normal expected-head fast-forward with no force.

The source tree and its 265/265 three-mode controls, 20/20 three-mode bridge suite, 328/328 two-mode adverse mutation qualification, and exact 28-retained-tool census are unchanged. New hosted required checks on this exact Main-targeting head must complete before integration; no cached result is substituted.

Preserve both exact histories and trigger current-base required checks; source tree matches the freshly tested combined composition.
Base automatically changed from codex/cbz-g11-architecture-cli-exercise-20261108 to main November 8, 2026 19:12
Preserve exact histories after #767 integration; source tree remains the freshly qualified dc88db5 composition.
@d6g8k5htny-coder
d6g8k5htny-coder marked this pull request as ready for review November 8, 2026 19:15
@d6g8k5htny-coder
d6g8k5htny-coder merged commit 2540673 into main Nov 8, 2026
14 checks passed
@d6g8k5htny-coder
d6g8k5htny-coder deleted the codex/cbz-g11-atlas-formal-bridge-exercise-20261108 branch November 8, 2026 19:24
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant