HEXA-Space Family β aerospace Β· 150/150 EXACT Β· Egyptian 3+2+1=n
aerospace Β· n=6 Β· Ο=12 Β· Ο=4 Β· Ο=2 Β· Egyptian 3+2+1=n Β· core Β· engineering Β· observation Β· life Β· operations Β· Starship Β· Falcon Β· Dragon Β· Starlink Β· astrodynamics Β· astrobiology
27-verb space substrate in 5 groups + runnable surface (RSC saturated 2026-05-08) + Stage-1 procurement-prep:
- core (cosmic, starship)
- engineering (aerospace, aerospace_transport, engineering, systems)
- observation (astrodynamics, astronomy, obs_astronomy)
- life (astrobiology, medicine)
- operations (ext, 16 β see Β§operations)
Per
bedrock/docs/runnable_surface_recipe.md(RSC) β all 4 preregistered falsifiersF-SPACE-{1,2,3,4}reach 67 % closure (T1 algebraic β + T2 numerical β; T3 hardware-only awaits Phase F funding).verify/ships 12 cross-cutter scripts (lattice_check,cross_doc_audit, 6Γnumerics_*,falsifier_check,lint_numerics,saturation_check,board_audit) + 4 Stage-1firmware/sim/*.hexasim-firmware (Phase C) + 4firmware/hdl/*.vVivado-synth Verilog skeletons (Phase D) + 4firmware/board/*/per-board procurement bundles (Phase E β schematic + BOM + PCB stack-up + commissioning checklist + KiCad-readable.kicad_sch).
hexa-space is the standalone Space Toolkit in the HEXA family β a
spec-first single-source-of-truth substrate that:
- pulls every space domain registered under
canon/domains/space/(canonical 11 verbs) into one organized CLI surface, and - extends that core with a 16-verb
operationsgroup that interprets SpaceX-domain entities (Starship Β· Falcon Β· Dragon Β· Starlink Β· DTC Β· Mars roadmap Β· MondAloy alloy Β· β¦) onto the n=6 invariant lattice.
It is the n=6 substrate's empirical companion for the space axis
(sister of hexa-bio for biology and hexa-cosmos for theoretical
cosmology).
ββββββββββββββββββββββββ
β hexa-space β
β (n=6 axis) β
ββββββββββββ¬ββββββββββββ
β
ββββββββββββββ¬ββββββββββββββ¬ββββ΄ββββββββββ¬ββββββββββββ¬βββββββββββββββ
β β β β β β
ββββββΌβββββ ββββββΌβββββ βββββββΌββββββ ββββββΌβββββ βββββΌβββββββββββ
β core β βengineer-β βobservationβ β life β β operations β
β (2) β β ing (4) β β (3) β β (2) β β (16, ext) β
βββββββββββ βββββββββββ βββββββββββββ βββββββββββ ββββββββββββββββ
β²
β
drafted from SpaceX
intel 2026-05-07
(pending-upstream)
The lattice anchors every verb in a single algebraic identity:
Ο(6) = 12 12 frequency channels / 12 vertices
Ο(6) = 4 4 regimes / phase ladder
Ο(6) = 2 binary observation dichotomy
Jβ = 24 octahedral rotation group order
sopfr(6) = 5 2 + 3 = 5 (sum of prime factors)
master identity: Ο Β· Ο = n Β· Ο = 12 Β· 2 = 6 Β· 4 = 24
For ops verbs the lattice closes empirically against the SpaceX 2026
snapshot β e.g. sopfrβ΄ Β· Jβ = 15,000 (DTC FCC filing exact),
ΟΒ·sopfrΒ²/Ο = 150 (DTC throughput target Mbps),
ΟΒ·n/Ο β 3 = 33 (Super Heavy Raptor count).
hexa-space/
βββ cli/
β βββ hexa-space.hexa β unified dispatcher (status/group/ops/verify/spacex)
βββ verify/ β RSC Β§1 cross-cutter inventory (12 scripts + run_all)
β βββ run_all.hexa orchestrator: 16/16 (12 verify/* + 4 fw/sim) bookkeeping closure
β βββ lattice_check.hexa n=6 master closure across 27 verbs 24/24
β βββ cross_doc_audit.hexa anchor consistency across docs 18/18
β βββ numerics_kepler.hexa F-SPACE-1 T2 (Kepler 3rd, math_pure) 6/6
β βββ numerics_falcon.hexa F-SPACE-2 T2 (octaweb + Tsiolkovsky) 9/9
β βββ numerics_starship.hexa F-SPACE-4 T2 (33-Raptor + Ξv) 9/9
β βββ numerics_bone_loss.hexa F-SPACE-3 T2 (exp-decay + half-life) 8/8
β βββ numerics_lattice_arithmetic.hexa math_pure float β int 12/12
β βββ numerics_cross_pillar.hexa anchor agreement 8/8
β βββ falsifier_check.hexa F-SPACE-* closure-pct tracker 4/4
β βββ lint_numerics.hexa recipe Β§4 5-invariant lint 31/31
β βββ saturation_check.hexa RSC self-stop probe (STOP triggered)
β βββ board_audit.hexa Phase E doc audit 32/32
βββ firmware/ β Stage-1+ T3 closure path (.roadmap Β§A.6)
β βββ doc/README.md Phase C/D/E scope + Phase F readiness
β βββ sim/ Phase C β sim-firmware (.hexa, runs under hexa)
β β βββ orbit_pipeline.hexa HEXA-ORBIT-01 (F-SPACE-1) 13/13
β β βββ launch_telemetry.hexa HEXA-LAUNCH-01 (F-SPACE-2) 11/11
β β βββ dxa_pipeline.hexa HEXA-DXA-01 (F-SPACE-3) 11/11
β β βββ raptor_cluster.hexa HEXA-RAPTOR-01 (F-SPACE-4) 11/11
β βββ hdl/ Phase D β Vivado-synth Verilog skeletons
β β βββ orbit_pipeline.v xc7z020 / STM32H7 HLS shim
β β βββ launch_telemetry.v xczu7ev (Zynq US+ ZCU104)
β β βββ dxa_pipeline.v xc7z020 / STM32H7 HLS shim
β β βββ raptor_cluster.v xcku040 (Kintex US KCU105)
β βββ board/ Phase E β per-board procurement prep
β βββ README.md 4-board catalog + KiCad workflow
β βββ orbit_01/ launch_01/ dxa_01/ raptor_01/
β β βββ SCHEMATIC.md block diagram + net list + power tree
β β βββ BOM.csv line-item BOM with Digi-Key MPNs + prices
β β βββ PCB.md stack-up + outline + routing rules + EMC
β β βββ COMMISSIONING.md Phase F bring-up + closure-event gate
β β βββ <slug>.kicad_sch KiCad 7+ root sheet skeleton
β βββ orbit_01/orbit_01.kicad_pro full KiCad project file
βββ tests/ β regression harnesses (5 in hexa.toml [test])
β βββ test_selftest.hexa 11/11 canonical verb-spec sweep
β βββ test_spacex.hexa 5/5 spacex-track
β βββ test_ops.hexa 16/16 ops verb sweep
β βββ test_lattice.hexa 11/11 cross-cutter (verify/) sweep
β βββ test_firmware.hexa 4/4 Phase C sim-firmware sweep
βββ cosmic/ starship/ β core (2)
βββ aerospace/ aerospace_transport/ engineering/ systems/ β engineering (4)
βββ astrodynamics/ astronomy/ obs_astronomy/ β observation (3)
βββ astrobiology/ medicine/ β life (2)
βββ spaceship/ satellite/ space_center/ space_ai_center/ β operations (16, ext)
βββ space_datacenter/ falcon/ dragon/ recovery/
βββ orbital_depot/ hls/ starlink/ rideshare/
βββ station/ mars_base/ direct_to_cell/ mondaloy/
βββ aerospace_transport/spacex_intel_2026.md β ops data feed (web sweep 2026-05-07)
βββ hexa.toml β manifest (27 modules + 5 tests)
βββ install.hexa β hx install hook
βββ CHANGELOG.md README.md RELEASE_NOTES_v1.0.0.md LICENSE
βββ .roadmap.hexa_space β terminal goal + falsifiers + Β§A.6 Stage-1+ closure path
Quick links:
cli/ Β·
verify/ Β·
firmware/ Β·
tests/ Β·
hexa.toml Β·
install.hexa Β·
CHANGELOG.md Β·
LICENSE Β·
.roadmap.hexa_space
Per bedrock/docs/runnable_surface_recipe.md β closure ladder
0 % β 33 % β 67 % β 100 % per falsifier.
| Falsifier | Domain anchor | T1 (algebraic) | T2 (numerical) | T3 (hardware) | % |
|---|---|---|---|---|---|
| F-SPACE-1 | Kepler 3rd law n=6 corrections (Mercury 43β³/century baseline) | astrodynamics/verify_* β |
numerics_kepler β |
Phase F+G+H | 67 % |
| F-SPACE-2 | Falcon 9 9-engine octaweb (3Β·3 grid = ΟβΟ+1) | falcon/verify_* β |
numerics_falcon β |
Phase F+G+H | 67 % |
| F-SPACE-3 | ISS bone-loss Ο=4 phase recovery (NASA Twin Study) | medicine/verify_* β |
numerics_bone_loss β |
Phase F+G+H | 67 % |
| F-SPACE-4 | Starship 33-Raptor cluster (ΟΒ·n/Οβ3) | spaceship/verify_* β |
numerics_starship β |
Phase F+G+H | 67 % |
hexa run verify/falsifier_check.hexa β __HEXA_SPACE_FALSIFIER_CHECK__ PASS 4/4 β₯ 67%.
hexa run verify/saturation_check.hexa β __HEXA_SPACE_RSC_SATURATED__ STOP.
| Phase | Layer | Status | Artefact |
|---|---|---|---|
| A | Recipe baseline (RSC Β§1 12-cross-cutter inventory) | β | verify/ |
| B | Per-falsifier T1 algebraic + T2 numerical | β | pillar verify_* + verify/numerics_* |
| C | Sim-firmware (state-machine + DAC/ADC pipeline) | β 46/46 PASS | firmware/sim/*.hexa |
| D | HDL skeleton (Vivado 2024.1+ synthesizable) | β 4/4 boards | firmware/hdl/*.v |
| E | Procurement prep (schematic + BOM + PCB + commissioning + KiCad) | β 32/32 audit PASS | firmware/board/*/ |
| F | Physical board procurement | β funding gate ~$26 k (Stage-1 program) | (external β JLCPCB / PCBWay) |
| G | Bench commissioning (per COMMISSIONING.md checklists) |
β requires F | (external bench) |
| H | F-SPACE-N T3 closure event (flips falsifier_check to 100 %) | β requires G | updates falsifier_check.hexa F_T3 anchor |
Stage-1 program cost (qty 5 each + Vivado license shared) β $26 k within .roadmap Β§A.6 ~$25 k envelope.
Five test harnesses live in tests/ and are wired into
hexa.toml [test]:
| Harness | Scope | Result |
|---|---|---|
tests/test_selftest.hexa |
11 canonical verb-spec presence sweep | 11/11 PASS |
tests/test_spacex.hexa |
spacex track: verify + mk_ladder + analyzer + cli proxy + selftest regression | 5/5 PASS |
tests/test_ops.hexa |
16 ops verb sweep + cli ops verify-all proxy |
16/16 PASS |
tests/test_lattice.hexa |
11 RSC cross-cutter (verify/) sweep β direct + cli-proxy each | 11/11 PASS |
tests/test_firmware.hexa |
4 Phase C sim-firmware sentinel sweep (HEXA-{ORBIT,LAUNCH,DXA,RAPTOR}-01) | 4/4 PASS |
Run them all:
for t in tests/test_selftest.hexa tests/test_spacex.hexa tests/test_ops.hexa \
tests/test_lattice.hexa tests/test_firmware.hexa; do
HEXA_SPACE_ROOT=$PWD hexa run "$t" | tail -3
donehexa run verify/run_all.hexa # 16/16 bookkeeping closure across all verify/*.hexa + firmware/sim/*.hexa
# expected tail: __HEXA_SPACE_RUN_ALL__ PASSCoverage table for the orchestrator sweep:
| Tier | Count | Scripts | Result |
|---|---|---|---|
| T2 numerical | 6 | numerics_{kepler,falcon,starship,bone_loss,lattice_arithmetic,cross_pillar} |
6/6 |
| meta cross-cutter | 6 | lattice_check, cross_doc_audit, falsifier_check, lint_numerics, saturation_check, board_audit |
6/6 |
| Phase C sim-firmware | 4 | firmware/sim/{orbit_pipeline,launch_telemetry,dxa_pipeline,raptor_cluster}.hexa |
4/4 |
| Total | 16 | bookkeeping closure across verify/*.hexa + firmware/sim/*.hexa |
16/16 |
closure, NOT physics-settled. T3 = published-invariant agreement (ISS / SpaceX
FCC / JAXA Kibo / NASA-HRP Twin Study) NOT live raw telemetry or lattice fit.
Underlying space-program CLAIMS (Mars colony, Dyson swarm, interstellar probe,
Starship $200/kg, lunar Gateway, crewed-Mars architectures) remain UNPROVEN
until Stage-1+ hardware (Phase F β G β H). Saturated β falsified β confirmed.
See LATTICE_POLICY.md Β§1.2 + LIMIT_BREAKTHROUGH.md Β§5.
Or run any single cross-cutter / firmware sim via the CLI proxy:
hexa run cli/hexa-space.hexa verify lattice # 24/24 EXACT
hexa run cli/hexa-space.hexa verify falsifier # 4/4 β₯ 67%
hexa run cli/hexa-space.hexa verify saturation # __HEXA_SPACE_RSC_SATURATED__ STOP
hexa run cli/hexa-space.hexa verify board-audit # 32/32 Phase E doc audit
hexa run cli/hexa-space.hexa verify fw-orbit # 13/13 sim-firmware
hexa run cli/hexa-space.hexa verify numerics-kepler # 6/6 Kepler T2Entry: cli/hexa-space.hexa.
hexa run cli/hexa-space.hexa <subcmd> [args]| Subcmd | Description |
|---|---|
status |
27-verb status table + caveats |
selftest |
canonical-verb presence sweep (11/11 expected) |
group <name> |
list verbs in core / engineering / observation / life / operations |
ops [list|verify-all] |
operations registry / 16-verb verify sweep |
verify <verb> |
run verify_<verb>.hexa for any registered verb |
verify-all |
run every available verify_*.hexa across all 5 groups |
verify <cross-cutter> |
run any RSC cross-cutter β see table below |
spacex <subcmd> |
SpaceX 2026 program registry (intel/list/active/upcoming/group/show/counts/verify/mk) |
--version |
print version |
| Alias | Script | Sentinel | Use |
|---|---|---|---|
lattice |
verify/lattice_check.hexa |
__HEXA_SPACE_LATTICE__ PASS |
n=6 master closure across 27 verbs (24/24) |
cross-doc |
verify/cross_doc_audit.hexa |
__HEXA_SPACE_CROSSDOC__ PASS |
anchor consistency across docs (18/18) |
numerics-kepler |
verify/numerics_kepler.hexa |
__HEXA_SPACE_NUMERICS_KEPLER__ PASS |
F-SPACE-1 T2 |
numerics-falcon |
verify/numerics_falcon.hexa |
__HEXA_SPACE_NUMERICS_FALCON__ PASS |
F-SPACE-2 T2 |
numerics-starship |
verify/numerics_starship.hexa |
__HEXA_SPACE_NUMERICS_STARSHIP__ PASS |
F-SPACE-4 T2 |
numerics-bone-loss |
verify/numerics_bone_loss.hexa |
__HEXA_SPACE_NUMERICS_BONE_LOSS__ PASS |
F-SPACE-3 T2 |
numerics-lattice-arithmetic |
verify/numerics_lattice_arithmetic.hexa |
__HEXA_SPACE_NUMERICS_LATTICE_ARITHMETIC__ PASS |
math_pure float β int floor |
numerics-cross-pillar |
verify/numerics_cross_pillar.hexa |
__HEXA_SPACE_NUMERICS_CROSS_PILLAR__ PASS |
cross-pillar T2 anchor agreement |
falsifier |
verify/falsifier_check.hexa |
__HEXA_SPACE_FALSIFIER_CHECK__ PASS |
F-SPACE-* closure-pct tracker |
lint-numerics |
verify/lint_numerics.hexa |
__HEXA_SPACE_LINT_NUMERICS__ PASS |
recipe Β§4 5-invariant lint |
saturation |
verify/saturation_check.hexa |
__HEXA_SPACE_SATURATION_CHECK__ PASS + STOP signal |
RSC self-stop probe |
board-audit |
verify/board_audit.hexa |
__HEXA_SPACE_BOARD_AUDIT__ PASS |
Phase E doc audit (32/32) |
fw-orbit |
firmware/sim/orbit_pipeline.hexa |
__HEXA_SPACE_FW_ORBIT_01__ PASS |
Phase C sim β HEXA-ORBIT-01 |
fw-launch |
firmware/sim/launch_telemetry.hexa |
__HEXA_SPACE_FW_LAUNCH_01__ PASS |
Phase C sim β HEXA-LAUNCH-01 |
fw-dxa |
firmware/sim/dxa_pipeline.hexa |
__HEXA_SPACE_FW_DXA_01__ PASS |
Phase C sim β HEXA-DXA-01 |
fw-raptor |
firmware/sim/raptor_cluster.hexa |
__HEXA_SPACE_FW_RAPTOR_01__ PASS |
Phase C sim β HEXA-RAPTOR-01 |
Examples:
hexa run cli/hexa-space.hexa status
hexa run cli/hexa-space.hexa ops verify-all # 16/16 ops PASS
hexa run cli/hexa-space.hexa verify mondaloy # 9/9 EXACT
hexa run cli/hexa-space.hexa verify lattice # n=6 closure 24/24
hexa run cli/hexa-space.hexa verify falsifier # 4/4 β₯ 67% closure
hexa run cli/hexa-space.hexa verify saturation # __HEXA_SPACE_RSC_SATURATED__ STOP
hexa run cli/hexa-space.hexa verify fw-orbit # 13/13 Phase C HEXA-ORBIT-01
hexa run cli/hexa-space.hexa verify board-audit # 32/32 Phase E docs
hexa run cli/hexa-space.hexa verify-all # all 5 groups (canonical pillars)
hexa run cli/hexa-space.hexa spacex intel # SpaceX 2026 snapshot path
hexa run cli/hexa-space.hexa spacex active # active programs only
hexa run cli/hexa-space.hexa spacex group starship27-verb ν΅ν© substrate Β· RSC saturated (sat-1 β + sat-2 β at 2026-05-08) Β· 4/4 falsifiers @ 67 % closure Β· Phase A-E β Β· Phase F funding-gated.
- 11 canonical verbs at v1.0.0 ship as spec-only (
.mddesign docs). - 20 pillar
verify_<verb>.hexascripts test n=6 bookkeeping closure against domain anchors (16 ops verbs + aerospace + aerospace_transport- engineering + astrodynamics + medicine). They verify that the count-lattice math is internally consistent, NOT that physics obeys Ο=12 / Ο=4 / Jβ=24.
- 12 cross-cutter
verify/*.hexascripts (RSC Β§1) close the recipe inventory: lattice + cross-doc + 6 numerics + 4 meta (falsifier, lint, saturation, board-audit). - 4 Phase C sim-firmware scripts model Stage-1 controllers with
state machines + DAC/ADC pipelines + safety-interlock logic
(
__HEXA_SPACE_FW_*__ PASSΓ 4, 46/46 individual checks). - 4 Phase D HDL skeletons (.v Verilog) compile in Vivado 2024.1+ but are not flashable until Phase F boards arrive.
- 4 Phase E procurement-prep bundles (schematic + BOM + PCB + commissioning + KiCad-readable .kicad_sch) document the path to ~$26 k Stage-1 board procurement.
- The n=6 invariant lattice (Ο=12, Ο=4, Ο=2, Jβ=24, sopfr(6)=5) is hypothesized for canonical verbs and operationally fitted for ops verbs against documented SpaceX numbers. T3 closure event (Phase F+G+H) will test whether real silicon agrees with the closed-form derivations within recipe-stated tolerances.
verify/run_all.hexaorchestrator sweeps 16 scripts (6 T2 numerical + 6 meta cross-cutter + 4 Phase C sim-firmware) and emits__HEXA_SPACE_RUN_ALL__ PASSat 16/16 bookkeeping closure β sister pattern ofhexa-fusion/hexa-rtsc/hexa-cernrun_all. This is bookkeeping closure only; ISS/SpaceX/JAXA/NASA flight-data anchors use published invariants (NASA-HRP, FCC filings, Kepler 3rd law) NOT lattice fit. Space-program CLAIMS (Mars base, Dyson swarm, interstellar, crewed-Mars) remain UNPROVEN until Stage-1+ hardware (Phase F-G-H).- Verdict:
SPEC_PLUS_OPS_LATTICE_RSC_SATURATED(27/27 spec; 16/27 wired pillar; 12/12 RSC cross-cutter; 16/16 run_all bookkeeping; Phase A-E β; F-SPACE-1/2/3/4 all 67 %; T3 awaits Phase F).
# 1. Install hexa-lang (gives you `hexa` + `hx` package manager)
/bin/bash -c "$(curl -fsSL https://raw.githubusercontent.com/dancinlab/hexa-lang/main/install.sh)"
# 2. Install hexa-space
hx install hexa-spacehexa-space status # 27-verb status table + caveats
hexa-space selftest # canonical-verb presence sweep (11/11 expected)
hexa-space group <name> # list verbs in core/engineering/observation/life/operations
hexa-space ops [verify-all] # operations-group registry / 16-verb verify sweep
hexa-space verify <verb> # run verify_<verb>.hexa for any registered verb
hexa-space verify lattice # n=6 cross-pillar audit
hexa-space verify falsifier # F-SPACE-* closure-pct tracker
hexa-space verify saturation # RSC self-stop probe
hexa-space verify board-audit # Phase E procurement-prep doc audit
hexa-space verify-all # run every available verify_*.hexa across all 5 groups
hexa-space spacex <subcmd> # SpaceX 2026 program registry (intel/list/active/upcoming/group/show/counts/verify/mk)
# Orchestrator (sister of hexa-fusion / hexa-rtsc verify/run_all.hexa)
hexa run verify/run_all.hexa # aggregate sweep β 16/16 verify/*.hexa + firmware/sim/*.hexa (bookkeeping closure)MIT. See LICENSE.