Skip to content

Scheduled backups fail when snapshot copies cannot attach #5997

Open

Description

@devantler

🤖 Generated by the Agentic Engineer

Description

A scheduled volume backup can finish partially failed when temporary snapshot copies cannot obtain storage replicas. The resulting daily recovery point is incomplete.

Steps to Reproduce

  1. Back up multiple snapshot-backed test claims with constrained storage capacity.
  2. Check whether each temporary copy becomes attachable before the existing preparation deadline.

Expected Behavior

Every planned snapshot transfer completes, and the daily recovery point passes restore verification.

Actual Behavior

Temporary copies reported replica scheduling failures. Their uploads failed, and the scheduled backup finished partially failed.

Acceptance Criteria

  • Reproduce the temporary copy scheduling failure using isolated data and identify the capacity constraint.
  • Preserve source redundancy, backup coverage, deadlines and retention.
  • Verify a complete scheduled backup and restore representative data through the documented recovery path.

Part of #4980

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    Fields

    Priority

    None yet

    Effort

    None yet

    Projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions