Skip to content

Clarify planning surfaces and retire stale milestone machinery #299

Closed

Description

@flyingrobots

Summary

Inventory and reconcile the repository's planning surfaces after the product clarification work.

Why

The repo currently has multiple competing control planes:

  • open GitHub milestones that are all 100% complete relics
  • open issues from older milestone eras (for example IRONCLAD / M9)
  • local planning artifacts and docs that still encode the old platform/bridge roadmap
  • newly rewritten product docs that frame git-mind as inference-first semantic repository intelligence

We need one coherent operating model.

Scope

  • triage open GitHub issues against the new product frame
  • close or retire stale GitHub milestones
  • identify local manual tracking artifacts that should be aligned, archived, or demoted to historical notes
  • decide whether backlog should be managed primarily via IBM Hills + Playbacks rather than GitHub milestones
  • update design docs with the resulting operating model

Exit Criteria

  • one recommended backlog operating model
  • stale milestone machinery identified and retired or explicitly quarantined
  • misaligned tracking/docs called out and reconciled
  • product-facing docs no longer compete with historical planning surfaces

Activity

  1. flyingrobots commented on Mar 25, 2026

    @flyingrobots
    OwnerAuthor

    Completed by the merged planning-surface cleanup and governance work in PRs #301 and #302. The repo now has a canonical docs hierarchy, Hills/Playbacks operating model, and ADR-backed planning governance.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    lane:foundationSupporting lane — core hardening, contracts, integrity

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions