Volatility connectedness across the four submarkets of the Brazilian power system.

Python License: MIT Built on connectedness

The pororoca is the tidal bore that runs hundreds of kilometres up the Amazon against the current — a shock born in one system propagating deep into another. That is the object this repository measures.

How much of the volatility in one Brazilian submarket is inherited from the other three? Who transmits, who receives, and when does the national grid stop behaving like one market and start behaving like four? This repository answers those questions with the Diebold-Yilmaz connectedness framework applied to realized (semi)covariances of half-hourly marginal cost, 2021–2026, using the connectedness package.


Headline results

Sample: 2,066 complete days, 48 half-hours each (99,168 observations), four submarkets, 2021-01-01 to 2026-10-08.

Total connectedness index (realized variance, full sample) 57.9%
Range over 365-day rolling windows 44.1% – 69.8%
Most recent window (2026-10-08) 68.7%
Largest net transmitter (2024–2026 average) SE/CO, +6.1 pp
Largest net receiver (2024–2026 average) Norte, −5.3 pp

Three findings.

1. The grid is not one network — it is two blocks. The strongest links by far are SE/CO↔Sul and Nordeste↔Norte; the cross-block links are roughly half as strong. Average pairwise connectedness, 2024–2026 (share of the receiving market's forecast error variance attributable to the sending market):

SE/CO → Sul → Nordeste → Norte →
→ SE/CO — 29.9 17.8 15.9
→ Sul 31.1 — 15.8 14.4
→ Nordeste 19.8 16.7 — 21.2
→ Norte 18.9 16.0 21.9 —

2. SE/CO is the system's net transmitter, in every regime. It is the only submarket with a positive net position in all three sub-periods, and its lead widens as the system segments.

3. The system is segmenting, not integrating. The share of half-hours in which a pair of submarkets clears at different prices — i.e. a transmission constraint binds between them — rises sharply from 2024 onwards. SE/CO and Norte priced apart in 71% of half-hours in 2026, against 31% in 2023.

Rolling total and net directional connectedness, 2022-2026 Share of half-hours priced apart, by submarket pair and year

Why CMO and not PLD

This is the main modelling decision in the repository, and it is not cosmetic.

The Brazilian price is not an auction price

In most liberalised power markets the spot price is the clearing price of an auction over supply offers. Brazil does not work that way. The settlement price for differences (Preço de Liquidação das Diferenças, PLD) is produced by a chain of centralised stochastic optimisation models run by the system operator:

  • NEWAVE — medium/long-term policy over hydrological scenarios; produces the future cost function (FCF) that prices stored water;
  • DECOMP — short-term, weekly, inheriting NEWAVE's FCF;
  • DESSEM — daily, half-hourly unit commitment and dispatch; since January 2021 it is the model that underpins the hourly PLD.

The price that comes out is the shadow price of the dispatch problem: the marginal operating cost (Custo Marginal de Operação, CMO) of meeting one more unit of load. Nobody bids it.

PLD is a censored transform of CMO

PLD is CMO after regulatory truncation. For 2026 ANEEL set the floor at R$ 57.31/MWh, the structural cap at R$ 785.27/MWh and the hourly cap at R$ 1,611.04/MWh. That truncation is not a rare event. In this sample:

Share of half-hours with CMO exactly zero 2021 2022 2023 2024 2025 2026
SE/CO 1.1 14.4 92.6 12.7 7.8 13.9
Sul 1.0 14.7 93.3 13.5 2.6 11.6
Nordeste 1.6 37.6 92.4 15.5 14.1 20.7
Norte 0.7 17.4 80.5 10.0 3.7 2.8

Between a fifth and a third of all half-hours price at zero cost — surplus hours driven by hydrology and by the solar and wind build-out. Every one of them is a half-hour that PLD reports at the floor.

Why that breaks a realized-volatility study. Realized variance is the within-day sum of squared intraday price changes. Where PLD sits pinned at its floor, consecutive differences are mechanically zero. The estimator does not see "a calm hour"; it sees no variation at all, across stretches of hours in which the underlying system cost was in fact moving. The consequences compound: realized variance is biased down precisely in the surplus regime, the distribution of the realized measures acquires a point mass that the probability integral transform cannot repair, and the covariance terms pick up spurious co-movement, because four submarkets pinned at the same floor look perfectly synchronised.

So the panel is built on CMO. It is the same quantity, from the same model, before the regulatory clamp — the uncensored signal the estimator needs. Three further advantages: it is published semi-hourly (48 observations per day against 24 for hourly PLD, which materially improves realized covariance estimates), it covers 2021 onwards without a methodology break, and it is genuinely open.

A practical note on access. The CCEE open-data portal (PLD_HORARIO) serves its download endpoint only to a restricted set of IPs: requests from outside Brazil return 403 Acesso bloqueado. The ONS open-data S3 bucket used here has no such restriction. For anyone running this analysis from abroad, that alone settles the data-source question.

The honest counterpart: CMO is not the settlement price. Contracts settle at PLD. For any commercial reading of these results, estimate on CMO and then map the regime onto PLD, stating the caps explicitly. Volatility that the caps truncate is real volatility of system cost, but it is not realised cash flow.


What "connectedness" means when the price comes out of a model

Worth stating plainly, because the usual interpretation does not transfer.

In a bid-based market, a spillover index is read as information transmission: traders in one zone react to shocks in another. In Brazil there are no bidders to react. The four submarket prices co-move because:

  1. they are outputs of one optimisation carrying one future cost function, calibrated on a common set of hydrological scenarios — a shared factor by construction, not a transmission channel; and
  2. they are tied together by the physical interchange limits between subsystems: whenever a link is unconstrained the two submarkets clear at the same price, and they separate exactly when it binds.

Point 2 is what makes the exercise worth doing. The generalized FEVD measures how much the submarkets share; the informative event is when they stop sharing. Falling connectedness in this system is not decoupling noise — it is congestion and regional scarcity becoming the binding feature of the dispatch. That is why the price-separation statistic is reported next to the connectedness index: they are two views of the same mechanism.

The natural next step, and the way to turn this from a description into an indicator, is to regress the net directional and pairwise series on observable mechanisms. The covariates sit in the same ONS API and the download helper already reaches them: intercambio-nacional (hourly flows between subsystems, scheduled and verified), ena-diario-por-subsistema (natural energy inflow) and ear-diario-por-subsistema (stored energy). Not done here.


Full results

Static connectedness, realized variance, full sample

Each row is a receiving submarket, each column a sending one. Entries are percentages of the row market's forecast error variance.

FROM ↓ / TO → Norte Nordeste Sul SE/CO FROM others
Norte 44.41 21.44 15.90 18.24 55.59
Nordeste 21.69 45.18 15.32 17.80 54.82
Sul 14.59 13.43 40.32 31.66 59.68
SE/CO 15.82 15.07 30.50 38.60 61.40
TO others 52.11 49.95 61.73 67.69
NET −3.48 −4.87 +2.05 +6.30

Total spillover index: 57.87%.

By regime

Regime Days TSI NET SE/CO NET Sul NET Nordeste NET Norte
2021 water crisis 363 46.47% +1.4 +1.2 −4.0 +1.4
2022–2023 surplus 700 63.05% +6.8 +7.2 +2.3 −16.3
2024–2026 segmentation 1,003 58.73% +8.0 +0.2 −3.6 −4.6

Good versus bad volatility

Realized semicovariances split the realized covariance matrix into the part generated by co-movements of the same sign and the part generated by products of opposite sign (Bollerslev et al., 2020). Both systems are the vech of the 4×4 matrix — ten series — so their indices are comparable with each other but not with the 57.87% of the four-variable realized-variance system.

Measure TSI
Positive semicovariance (recov_pos) 73.49%
Negative semicovariance (recov_neg) 71.56%

Upside volatility is marginally more contagious than downside, but the asymmetry is weak — considerably weaker than what the same decomposition finds in bid-based electricity markets such as Australia. One more sign that the common driver here is a dispatch model rather than trader behaviour.

Price separation

Share of half-hours (%) in which a pair priced more than R$1/MWh apart, computed only over half-hours in which at least one of the two prices is positive. Without that condition the statistic is swamped by zero-cost hours, where both prices are trivially equal and the system would look perfectly integrated exactly when the price signal carries no information.

Year SE/CO–Sul SE/CO–NE SE/CO–N Sul–NE Sul–N NE–N
2021 23.1 47.2 59.2 45.1 57.9 54.6
2022 5.9 41.3 41.7 41.2 41.6 14.0
2023 15.1 16.5 30.9 17.9 31.6 30.5
2024 8.5 27.6 55.1 28.5 54.9 56.7
2025 31.6 51.4 60.9 50.3 61.1 56.0
2026 34.3 43.6 70.7 50.7 72.4 66.8

Price level and intraday dispersion

Year Mean CMO (R$/MWh), SE/CO · Sul · NE · N Mean within-day sd, SE/CO · Sul · NE · N
2021 525.2 · 525.9 · 466.5 · 475.9 37.2 · 35.1 · 55.1 · 29.9
2022 31.1 · 31.3 · 24.2 · 22.9 3.2 · 3.0 · 2.8 · 2.1
2023 6.6 · 6.1 · 6.3 · 6.7 8.9 · 8.4 · 8.4 · 8.8
2024 107.6 · 108.3 · 89.7 · 166.9 31.9 · 33.9 · 46.7 · 89.9
2025 216.0 · 226.3 · 150.9 · 163.0 73.8 · 66.5 · 76.9 · 62.8
2026 195.7 · 225.9 · 169.0 · 179.1 118.2 · 90.8 · 106.6 · 106.7

Intraday dispersion has more than tripled since 2024. Whatever else the solar build-out has done to the level of prices, it has made the shape of the day far more volatile — which is what gives a half-hourly realized-measure approach something to work with.


Caveats

2023 is not usable, and the figures show why. Over 90% of half-hours price at zero and the annual mean marginal cost is R$6.6/MWh. Realized variances in that year are numerical noise, and every rolling window overlapping it inherits the problem — visible as the violent swing in the net directional panel around late 2023. The sub-period table keeps 2023 inside an explicitly labelled surplus regime rather than dropping it quietly. Conclusions drawn from windows centred on 2023 should be discarded.

The estimates use the fast cross-validation preset (MHARConfig(fast=True): 3 folds, 12 candidate penalties, looser solver tolerance) so that the full run finishes in minutes. Published numbers should be re-estimated with the default preset, and the rolling design should be checked against window lengths other than 365 days.

Connectedness here is not causal. See the interpretation section above.

There is no international dimension to add. Brazil has no market coupling. ONS records cross-border exchange only with Argentina and Uruguay, at a scale of roughly ±0.5–1 GW against tens of GW of national load, and the mechanism is a price declared weekly by traders (ofertapreco-importacao), not a coupled clearing. A cross-country study of South American hydro-dependent spot prices would be a study of a common climate factor, not of transmission, and would have to say so.


Data

Every series comes from the ONS open-data portal, CKAN API, mirrored on S3 (sa-east-1), licensed CC-BY.

Dataset Slug Used for
CMO Semi-Horário cmo-semi-horario the price panel (half-hourly, by submarket)
Intercâmbios Entre Subsistemas intercambio-nacional congestion covariate (roadmap)
ENA Diário por Subsistema ena-diario-por-subsistema inflow covariate (roadmap)
EAR Diário por Subsistema ear-diario-por-subsistema storage covariate (roadmap)

pororoca.data.resource_urls(slug) resolves any of them to download URLs, so extending the panel needs no new plumbing. Raw downloads are cached under data/ and are not committed.


Reproducing

git clone https://github.com/franrolotti/pororoca
cd pororoca
uv venv && uv pip install -e . --prerelease=allow

python scripts/run_analysis.py --years 2021 2026 --window 365 --jobs 8

Downloads about 2 MB from ONS and finishes in a few minutes on a laptop. It writes every table in this README to results/, and both figures, in light and dark variants, to figures/.

src/pororoca/
  data.py       ONS access, panel construction, complete-day filter
  dynamics.py   rolling-window directional connectedness  (see below)
  analysis.py   static and sub-period tables, separation and censoring diagnostics
  figures.py    the two README figures, light and dark
scripts/
  run_analysis.py   end-to-end

The one piece that is not in the upstream package

connectedness.rolling_spillover fits the MHAR-LASSO on each window, builds the full generalized FEVD — and then returns only the total index, discarding the directional and pairwise entries it has just computed. The net directional series in the figure above, and every pairwise path, need exactly those entries.

pororoca.dynamics.rolling_directional re-runs the same per-window estimation through the package's public primitives (build_lags, fit_mhar_fixed_alpha, generalized_vd, spillover_metrics) and keeps all of it: TSI, directional TO/FROM, net, the pairwise matrix, and the fixed penalty actually used. The penalty is selected once on the full sample and held fixed across windows, as upstream does, so window-to-window movement reflects the data rather than re-tuned regularization.

Proposed upstream as franrolotti/connectedness#8; this module can be deleted once that lands.


References

  • Diebold, F. X. and Yilmaz, K. (2012). Better to give than to receive: Predictive directional measurement of volatility spillovers. International Journal of Forecasting 28(1), 57–66.
  • Diebold, F. X. and Yilmaz, K. (2014). On the network topology of variance decompositions: Measuring the connectedness of financial firms. Journal of Econometrics 182(1), 119–134.
  • Koop, G., Pesaran, M. H. and Potter, S. M. (1996). Impulse response analysis in nonlinear multivariate models. Journal of Econometrics 74(1), 119–147.
  • Pesaran, M. H. and Shin, Y. (1998). Generalized impulse response analysis in linear multivariate models. Economics Letters 58, 17–29.
  • Corsi, F. (2009). A simple approximate long-memory model of realized volatility. Journal of Financial Econometrics 7(2), 174–196.
  • Bollerslev, T., Li, J., Patton, A. J. and Quaedvlieg, R. (2020). Realized semicovariances. Econometrica 88(4), 1515–1551.
  • Chanatásig-Niza, E., Ciarreta, A. and Zárraga, A. (2022). A volatility spillover analysis with realized semi(co)variances in Australian electricity markets. Energy Economics 111, 106076.
  • MME (2019). Relatório Técnico GT Metodologia CPAMP nº 01/2019: implantação do DESSEM nas atividades de programação da operação e formação de preço horário.

License

MIT — see LICENSE.

About

Volatility connectedness across the four submarkets of the Brazilian power system — Diebold-Yilmaz on half-hourly DESSEM marginal cost, 2021-2026

Topics

Resources

Stars

0 stars

Watchers

0 watching

Forks

Releases

Packages

Contributors

Languages