Skip to content

APC decontruction requires wires cut now#29

Open
mkanke-real wants to merge 2 commits intofunky-station:masterfrom
mkanke-real:Engi
Open

APC decontruction requires wires cut now#29
mkanke-real wants to merge 2 commits intofunky-station:masterfrom
mkanke-real:Engi

Conversation

@mkanke-real
Copy link
Contributor

About the PR

A port of funky-station/funky-station#1471

Why / Balance

Currently a tider with a screwdriver and a crowbar can render APC's useless in about 6 seconds per APC which is HELLA fast. Plus APC's carry enough current to power a whole room+ worth of stuff so it would make sense you need at least some kind of shock prevention to disassemble them.

Technical details

Just adds - !type:AllWiresCut to the construction graph

Media

Requirements

  • I have read and am following the Pull Request and Changelog Guidelines.
  • I have added media to this PR or it does not require an in-game showcase.
  • If I am porting something, I have done my best to respect the appropriate licenses associated with the presented changes.

License

MIT

Breaking changes

Changelog

🆑

  • tweak: APCs now require wires to be cut to deconstruct

Co-authored-by: funkystationbot <funky@funkystation.org>
Co-authored-by: Tay <td12233a@gmail.com>

(cherry picked from commit b8d8072d281e21f5ce13e9d55ac97cac7b67ba64)
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant