Skip to content

chore: remove shipped warm-pi-provider-processes plan/spec docs#143

Merged
glittercowboy merged 1 commit into
mainfrom
chore/cleanup-warm-pi-docs
May 2, 2026
Merged

chore: remove shipped warm-pi-provider-processes plan/spec docs#143
glittercowboy merged 1 commit into
mainfrom
chore/cleanup-warm-pi-docs

Conversation

@glittercowboy

@glittercowboy glittercowboy commented May 2, 2026

Copy link
Copy Markdown
Contributor

Summary

  • Plan + design spec for the bounded warm Pi provider workers feature merged in 9d273ce. Removing now that the work is shipped.

Test plan

  • No code changes; docs only

🤖 Generated with Claude Code

Summary by CodeRabbit

  • Documentation
    • Removed internal specification and implementation planning documents to streamline the documentation repository.

Plan and design spec for the bounded warm Pi provider workers feature
merged in 9d273ce.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
@coderabbitai

coderabbitai Bot commented May 2, 2026

Copy link
Copy Markdown

No actionable comments were generated in the recent review. 🎉

ℹ️ Recent review info
⚙️ Run configuration

Configuration used: defaults

Review profile: CHILL

Plan: Pro Plus

Run ID: 89c48b96-a40d-4811-83ad-23c5549ab1a9

📥 Commits

Reviewing files that changed from the base of the PR and between 30531cd and 57fba33.

📒 Files selected for processing (2)
  • docs/superpowers/plans/2026-04-29-warm-pi-provider-processes.md
  • docs/superpowers/specs/2026-04-29-warm-pi-provider-processes-design.md
💤 Files with no reviewable changes (2)
  • docs/superpowers/specs/2026-04-29-warm-pi-provider-processes-design.md
  • docs/superpowers/plans/2026-04-29-warm-pi-provider-processes.md

📝 Walkthrough

Walkthrough

Two documentation files describing the warm Pi provider processes architecture and implementation plan are removed. The deleted content previously specified worker lifetime management, eviction policies, provider behaviors, and task execution flows for daemon systems. No code changes are included.

Changes

Documentation Removal

Layer / File(s) Summary
Specification and Plan Documents
docs/superpowers/specs/2026-04-29-warm-pi-provider-processes-design.md, docs/superpowers/plans/2026-04-29-warm-pi-provider-processes.md
Design specification and implementation plan for warm Pi/provider process lifetimes are fully deleted (2,506 lines removed total).

Estimated code review effort

🎯 1 (Trivial) | ⏱️ ~2 minutes

Possibly related PRs

Poem

📜✨ A rabbit hops away with docs in tow,
Plans and specs take their final bow,
Warm processes fade to yesterday's snow,
Git records what was, though we let it go. 🌙

🚥 Pre-merge checks | ✅ 5
✅ Passed checks (5 passed)
Check name Status Explanation
Description Check ✅ Passed Check skipped - CodeRabbit’s high-level summary is enabled.
Title check ✅ Passed The PR title 'chore: remove shipped warm-pi-provider-processes plan/spec docs' directly and accurately describes the main change: removal of documentation for a completed feature.
Docstring Coverage ✅ Passed No functions found in the changed files to evaluate docstring coverage. Skipping docstring coverage check.
Linked Issues check ✅ Passed Check skipped because no linked issues were found for this pull request.
Out of Scope Changes check ✅ Passed Check skipped because no linked issues were found for this pull request.

✏️ Tip: You can configure your own custom pre-merge checks in the settings.

✨ Finishing Touches
🧪 Generate unit tests (beta)
  • Create PR with unit tests
  • Commit unit tests in branch chore/cleanup-warm-pi-docs

Review rate limit: 9/10 reviews remaining, refill in 6 minutes.

Comment @coderabbitai help to get the list of available commands and usage tips.

@glittercowboy glittercowboy merged commit 7a3aee5 into main May 2, 2026
3 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant